Sleep and I fight for a while. Wake at 4 which is positive in it means I can get some stuff done but a pain in terms of rest. Dash for train beckons so I can have time to do stuff at the Mancy end of the journey with decent coffee and joy in my heart...... Oh, I'm such a fucking cosmopolitan culchee me!

Monday, January 10, 2005

Prince2 Homework - Appendix B from Manual

Project Team Roles Project Board Approves major plans and authorises major deviations from agreed stage plans. Authority that signs off each stage and authorises next stage. Ensures required resources and arbitrates conflict or negotiates solutions between project and external bodies. Approves appointment and responsibilities of the Project Manager. Has following responsibilities that need tailoring project by project:

  • Approves start of project by accepting Project Brief.
  • Agrees with Project Manager their responsibilities and objectives.
  • Confirms with corporate or pogramme management of project tolerences.
  • Specification of external constraints on project such as quality assurance.
  • Approval of accurate and satisfactry Project Initiation Document including that it complies with customer standards and policies and associated contracts with suppliers.
  • Delegation of Project Assurance roles.
  • Commitment of project resources required by next stage plan. As project progresses:
  • Provision of guidance and direction to project ensuring stays within specified constraints.
  • Review completed stages and approve next stage plan.
  • Review and approve stage plans and any exception plans.
  • Ownership of identified risks as allocated at plan approval time - monitors risk and advises Project Manager of changes in status and actions to take to reduce risk.
  • Approval of changes.
  • Compliance with corporate or management directives. At the end of the project:
  • Assurance all produces have been delivered satisfactorily.
  • Assurance acceptance criteria have been met.
  • Approval of nd Project Report.
  • Approval of Lessons Learned Report and passage to appropriate standards group to ensure action.
  • Decisions on recommendations for folow on actions and passage of these to appropriate authorities.
  • Approval where apropriate of Post-Project Review Plan.
  • Project Closure Notificaton to corporate or progamme management. Project Board owns the process Directing a Project DP Ultimately responsible for assuarance that project remains on course to deliver desired outcome of required quality to meet business case defined in PID. Approves and funds changes. Executive Has ultimate responsibility for the project supported by Senior Uer and Senior Supplier. Role is to ensure focus on objectives and delivering product achieving projected benefits. Executive ensures value-for-money balancing demans of business, user and supplier.
  • Oversee development of Project Brief and Business Case
  • Ensures coherent project organisation and logical set of plans.
  • Authorises customer expenditure and set stage tolerances.
  • Monitor control the progress of project at strategic level, in particular reviewing the Business Case continually.
  • Ensure proposed changes of scope, cost, timescale checked against possile effects on Business Case.
  • Ensure risks are tracked and mitigated against.
  • Brief corporate or programme management on project progress.
  • Organise and chair Project Board meetings.
  • Recommend future actions on project to coroporate or programme management if project tolerence exceeded.
  • Approve end project Report and Lessons Learned Report ensure outstanding issues are documented and passed on to appropriate body.
  • Approve sending of project closure to programme or corporate management.
  • Ensure benefits are realised by holding post-project review and forward to review to appropriate stakeholders. Executive responsible for overall business assurance ensuring it stays on target to deliver benefits on schedule within tolerances for budget and schedule. Business assurance covers:
  • Validation and monitring of Business Case against external events and against project progress.
  • Keeping project in line with customer strategies.
  • Monitoring project finance on behalf of the customer.
  • Monitoring business risks to ensure that these are kept under control.
  • Monitor supplier and contractor payments.
  • Monitor changes to Project Plan for impact on Business Case or needs of Business.
  • Assessing impact of potential changes on Business Case or Project Plan.
  • Constraining user and supplier excesses.
  • Informing project of changes caused by programme of which it is part.
  • Monitoring stage and project progress against agreed tolerances. Executive is key decision maker with advice and commitment from others. Senior User Responsible for the specification of te needs of all those who will use the final product, for user liaison with the project team and monitoring the solution meets needs of the Business Case in terms of quality, functionality and ease of use. Represents users to whom product will deliver benefits. Commits user resources aainst requirements. May require more than one person to cover user interests. Shouldn't be too split it isn't effective. Specific Responsibilities are:
  • Ensure desired poject outcome is achieved.
  • Progress towad outcome required by users remains onsistent from user perspective.
  • Promote and maintain focus on desired project outcome.
  • Ensure user resources required by project are released.
  • Approve Product Descriptions for products that act as inputs or outputs from supplier function or that will directly affect them.
  • Ensure products are signed off once completed.
  • Prioritise and contribute user opinions on Project Board decisions on whether to implement recommended changes.
  • Resolve user requirements and prioity conflicts
  • Provide user view on Follow-on Action Reccomendations.
  • Brief and advise user management on all matters concerning project. Assurance responsibilities are:
  • Specification of users needs is accurate, complete and unambiguous.
  • Development of solution at all stages is monitored to meet users needs and progress towrds that.
  • Impact of potential changes is evaluated from user point of view.
  • Risks to users are constantly monitored.
  • Quality checking of product has appropriate user representation.
  • Quality control procedres are used correctly to ensure product meets user requirements.
  • User liaison is functioning effectively. May delegate authority for som assurance responsibilities. Senior Supplier Represents interests of those designing, developing, facilitating, procuring, implementing and possiby operating or maintaining products. accountable for quality of prducts delivered by the supplier. Must have authority to commit or aquire supplier resources In some environments customer may share design authority or have major say in it. May require more than one person to represent suppliers. Specific responsibilities:
  • Agree objectives for supplier activity.
  • Make sure progress towards outcomes is consistent from supplier point of view.
  • Promote and maintain focus on project outcome from supplier management perspective.
  • Ensure supplier resurces required for project are made available.
  • Approve Product Descriptions for supplier products
  • Contribute supplier opinions on Project Board decisions ot implement recommendations on proposed changes.
  • Resolve supplier requirements on priority conflicts.
  • Arbitrate on an resolve supplier priority or resource conflicts.
  • Brief non-technical management on supplier aspects of project. Responsible for specialist integrity of project. Assurance responsibilities are.
  • Advise on selection of development strategy, design and methods.
  • Ensure any supplier and operating standards defined by project are met and used to good effect.
  • Monitor potential change and impact on correctness, completeness and integrity of products against Product Description from supplier perspective.
  • Monitor risks in production aspects of project.
  • Ensure correct use of quality controm procedures so product adheres to requirements. May delegate some assurance responsibility. Project Manager Has authoity to run project on day-to-day basis on behalf of the Project Board within constraints laid down by the board. Prime responsbility to ensure project prduces required products o required standard of quality within specified constraints of time and cost. Responsible for producing result capable of achieving benefits defined in business case. Specific responsibilities:
  • Manage production of required prducts.
  • Direct and motivate project team.
  • Plan and monitor project.
  • Agree delegation and use of Project Assurance roles required by Project Board.
  • Produce PID.
  • Prepare Project, Stage and if neccesary Exception Plans in conjunction with Team Managers and appointed Projecte Assurance and agree them with Projct Board.
  • Manage risks, including development of contingency plans.
  • Liaise with programme management if project part of programme.
  • Liaise with programme management or related projects to ensure no overlooked or duplicated work.
  • Responsible for overall progress and use of resources and initiate corrective action if needed.
  • Responsible for change control and required configuration management.
  • Prepare and report to Project Board through Highlight Reports and End Stage Reports.
  • Liasie with Project Board or appointed Project Assurance on overall direction and integrity of project.
  • Agree technical and quality strategy with appropriate members of project board.
  • Prepare lessons learned Report.
  • Prepare any Follow on-Action Recommendations Report.
  • Prepare End Project Report.
  • Identify and obtain any support or advice required for managment, planning and control of project.
  • Be resopnsible for project admin.
  • Liaise with suppliers or account managers.
  • May also perform Team Manager and Project Support roles. Team Manager Prime responsbility t ensure prodution of products defined by Project Manager to appropriate quality in timescale and at cost acceptable to Project Board. Reports to and takes direction from Project Manager. Specific responsibilities.
  • Prepare plans for teams work and agree with Project Manager.
  • Recieve authorisation fro Project Manager to create products.
  • Manage the team.
  • Direct, motivate, plan and monitor teams work.
  • Take repsonsibility for progess of team's work and use of team resources and initieate corrective action within constraints aid down by Project Manager.
  • Advise Project Manager of deviations from plan, reccomend action, help prepare Exception plans.
  • Pass back to Project Manager products completed and approved in line with Work Package Plan.
  • Ensure project issues reported to person maintaining Issue Log.
  • Ensure evaluation of any Project Issues that arise in teams work and recommend actions to Project Manager.
  • Liaise with any Project Assurance roles.
  • Attend stage assessments as directed by Project Manager.
  • Arrange with lead team checkpoint meetings and produce Checpoint Reports aas agreed with Project Manager.
  • Ensure quality controls of team's work are planned and perfored correctly.
  • Ensure appropriate entries in Quality Log.
  • Maintain and ensure existence of team files.
  • Identify and advise roject Manager of risks associated with Work Package.
  • Ensure all identified risks are entered in risk log.
  • Manage specif risks as directed by Project Manager. Project Assurance Covers all interests in project, business, user, supplier. Must be independent of Project Manager, Project Board can not delegate responsibilities in this area to Project Manager. Specific responsibilities need to answer the question What is to be assured, may include:
  • Maintainence of thorough liaison throughout project netween supplier and customer.
  • User needs and expectations are met and managed.
  • Risks are controlled.
  • Adherence to business case.
  • Constant reassessment of value-for-money.
  • Fit with overall strategy of corporation or programme.
  • Right people are being involved.
  • Acceptable solution is being developed.
  • Project remains viable.
  • Scope of project is not 'creeping upwards' unnnoticed.
  • Focus on business need.
  • Internal and external communications are working.
  • Applicable standards are being used.
  • Legislative containts are observed.
  • Needs of specialist interests (eg. security) are being observed.
  • Adherence to quality assurance standards. Need to check all standards are met don't assume they will be.

  • Quick Post for Fun

    In all the PONCE2 excitement I forgot Single Search Environment went live today on National Library for Health. Mail to Blog seems to be sluggish to say the least so post from lunchtime will appear whenever. My brain hurts and I need to do my PONCE2 homework..... Not inclined to but know I need to.

    Sunday, January 09, 2005

    Bad Karma Beckons

    Curses, don't get the news out of Furl and on to blog. Apologies Sally, my heads full of this PRINCE course and the pre-course reading I should have done on Saturday as well as today. Cold has got heavier. Need a bath before bed because I've spent the day sweating like a pig. Learn the truth about 'Porky Prime Cuts' as a result of radi as I type notes to sink this PRINCE stuff into my head. Beer, pills and bed beckon. Not as rock'n'roll as it sounds the pills are LEMSIP!

    Prince2 Manual - Chapter 3

    3.1 Management Levels 4 parallel management levels:

  • Coporate or programme management is ighest level, outside Project Management it sets the agenda.
  • Directing a Project highest level wthin project completed by Project Board. For key decision making and direction setting.
  • Managing a project- day-to-day planning and control level, largely handled by the project manager.
  • Managing product delivery, hadled by Team Managers. Interact:
  • Higher level processes control lower levels e.g. managing a project creates work package for managing product delivery.
  • Output at lower levels provides inputs that allow higher-level processes to function effectively.

  • Prince2 Manual - Chapter 2

    2.1 What is a Project? A management environment created for the purpose of delivering one or more business products according to a specified business case or a temporary organisation needed to produce a unique and predefined outcome or result at a prespecified time using predefined resources. PRINCE2 Projects therefore have:

  • Finite and defined life cycle
  • Produce defined and measurable business products
  • A corresponding set of activities to achieve the business products
  • Defined amount of resources
  • Organised structure with defined responsibilities to manage the project. May be stand alone or part of a programme. When completed the project is disbanded. The life cycle which is the path and sequence through the various activities to produce the final product. Life span is used to describe the life of the product. 2.2 The scope of PRINCE2 Aspects of existing project management that are proven and excluded from PRINCE2 which may also be used include:
  • People management techniques
  • Generic planning techniques such as Gannt charts and critical path analysis.
  • Risk management techniques.
  • Corporate quality management and assurance mechanisms.
  • Budgetary control and earned value analysis techniques. Covers management of the project and resources involved in undertaking activities of the project. Assumes that project is run within a contract context but excludes specialist areas such as procurement and contracting. These will if required early on increase the importance of a complete and accurate Project Initiation Document (PID). Designed for use on any type of project in any environment but application will vary. Always focussed on delivering specific products to meet specified business case. Benefits are stated in the business case and may be:
  • Financial.
  • Strategic.
  • Legislative. Business case is constatnly reviews and progress measured against defined benefits. New benefits may be discovered along the way but deviations must be controlled through the Project Board. Stakeholders to be involved:
  • Customers
  • Users who will operate final product.
  • Suppliers giving specialist resource
  • Sub-contractors providing products or services to suppliers. Assumes customer will specify desired product and make use of final product and supplier who provide resources and skills to create product. Assumes these are two different parties. Customer participation is key. Configuration management is an essential part of project control focussed on controlling products delivered and knowing where they are at, at any point, their status, who is working on them and the latest version. Risk must be managed, PRINCE incorporate this process. Initiation covers planning and definition of project. May be part of a work programme. PRINCE aimed at middle between high level strategy and specialist techniques to deliver speialist services. Feasibility Studies - may be required under PRINCE2 best handled as seperate project. 2.4 Overview of PRINCE2 Process based approach to project management. 2.5 The processes 8 management processes, key issue is how extensively each of the following should be emplyed within a project: Starting a project - first process. Ensures prereuisites for starting are in place. Expects Project Mandate (high level reason for project and product required). Should be a short process built around the establishment of:
  • Design an appointment of project management team.
  • Project Brief.
  • Project Approach (how solution will be provided).
  • Cusomers quality expectations.
  • Risk log
  • Initiation stage plan. Directing a project - runs from end of Starting Up a Prject until projects closure. Aimed at the Project Board which manages by exception and monitors through report and controls through a number of decision points. Key processes are:
  • Initiation.
  • Stage boundaries (commitment of more resources after checking current results).
  • Ad hoc direction (progress monitoring, advice and guidance, reacting to threats to plans and benefits).
  • Project closure (confirming outcome and controlled close) Initiating a project - objectives are to:
  • Define how required product quality will be achieved
  • Plan and cost project.
  • Document and confirm acceptable Business case for project.
  • Ensure investment of time and effort is justified taking into account risks.
  • Enable and encourage project board to take ownership of project.
  • Provide baseline for decision making processes during project's life.
  • Agree to commitment of resource for next stage of project. Key element is the Project Initiation Document which defines the What, Why, Who, When and How of the project. Also creates blank:
  • Quality log.
  • Issue log.
  • Lessons learned log. Managing stage boundaries - Produces the information on which the Project Board will take key decisions on whether to continue with the project or not. Objectives are:
  • Assure project board that all products lanned in current Stage Plan have been completed as defined.
  • Provide the information to enable Project Board to assess continuing viability.
  • Provide Project Board with other information to aprove current stage's completion and authorise start of next stage together with designated tolerence level.
  • Record any measurements or lessons that can help later stages of project or other projects. Products of process are:
  • End stage report given by Project Manager to Project Board containing Stage achievements.
  • Current Stage Plan actuals, performance against Stage Plan.
  • Next Stage Plan or Exception Plan for which approval is sought.
  • Revised Project Plan
  • Updated Risk Log, used to assess continuing viability of project by the Project Board.
  • Revised Business Case.
  • Lessons Learned Log, updated with lessons from current stage.
  • Changes to structure or staffing of Project Management Team. Controlling a stage - Monitoring and control activities that are the day-to-day management of the project for the Project Manager as htey ensure things stay on course and react to unexpected events. Will be a cycle of:
  • Authorising work to be done.
  • Gathering progress information about work.
  • Watch for changes.
  • Review the situation.
  • Reporting.
  • Taking neccessary corrective action. Process covers these activities and ongoing work on rik and issue management. Cyclic production of the following products occurs:
  • Work packages.
  • Highlight Reports.
  • Project Issues (updated Issue Log).
  • Updated Risk Log.
  • Regularly updated Stage Plan. May also be need for an Exception Report. Managing product delivery - this process ensures that planned prodcts are created and elivered to the project by:
  • Team Manager negotiating Work Packages with the Project Manager.
  • Ensuring all work on products allocated to the team is authorised and agreed.
  • Ensuring that work conforms to requirements and interfacces agreed in Work Package.
  • Ensuring work is done.
  • Assessing work progress and forecasts regularly.
  • Ensuring products meet quality criteria.
  • Obtaining approval for completed products. Products created or updated include:
  • Team plans.
  • Quality logs - giving Project Manager view of the quality of work done.
  • Project Issues (updating Business Case)
  • Risk Log updates.
  • Checkpoint Reports, regular reports form Team Manager to the Project Manager. Closing a project - executes a controlld close to the project. Covers the Project Manager's work as wrap up at end or at premature closure. Most of the work is to prepare input into Project Board for confirmation prject may close. Objectives are therefore:
  • Check extent to which PID aims and objectives have been met.
  • Confirm customers acceptance of products.
  • Assess the extent to which expected products have been handed over and accepted by customer.
  • Confirm maintenance and operation arrangements are in place (including relevant training).
  • Make recommendations for future work (Fillow-on Action Recommendations)
  • Capture lessons resulting project and complete Lessons Learned Report.
  • Prepare End Project Report.
  • Prepare Post Project Review Plan.
  • Archive the Project files.
  • Notify host organisation od intention to disban project organisation an release the resources (nd project notification). Planning - repeatable process with important role in:
  • Planning an Initiation Stage.
  • Planning a Project.
  • Planning a Stage.
  • Updating a Project Plan.
  • Accepting a Work Package.
  • Producing an Exception Plan. Apart from plan, process produces:
  • Product checklist a table of products to be produced by work planned with space for planned and actual dates for delivery of draft quality checked and approved products.
  • Risk Log updated with risk situations arising out of planning activity. Business case - viable business case main control condition of a PRINCE2 Project. Verified by Project Board before the project begins and at every major decision stage. Project is stopped if viability dissapears Organisation - PRINCE2 provides structure for Project Management team and definition of repsonsibilites and relationships. These roles can be combined and shared depending on size of project. Plans - PRINCE2 offers series of plan levels tailored to size and project needs based on products not activities. Controls - PRINCE2 provides set of controls to facilitate key decision making information to pre-empt problems. Split into stages to define review and commitment points. Management of Risk - PRINCE2 defines key moements for review of risk and outlines anaysis and management of risk and tracks progress. Quality in a Project Environment - PRINCE2 recognisies the importance of quality and incorporates it in management. Begins with customer and by laying down standards and inspection methods and checks they are used. Configuration Management - Tracking components of final product and versions. PRINCE2 defines essential facilities and information requirements for configuration management method and linkage to other PRINCE2 techniques and components. Change Control - PRINCE2 emphasises need for change control enforced by change control technique and identification of processes that apply to change control. Techniques - left open to be used as appropriate but does detail:
  • Product based planning.
  • Change control.
  • Quality Review.

  • Prince2 Manual - Chapter 1

    PRINCE (PRojects IN Controlled Environments) is a structured method for Project Management and provides the de facto standard for UK Government projects. 1.1 Why Use a Project Management Method? Reduce risk of project failure as a result of:

  • Lack of vaid business case
  • Insuffient attention to quality
  • Ill defined outcomes
  • Poor communication with stakeholders
  • Badly defined project management roles and responsibilities resulting in lack of direction and poor decision making
  • Costs and duration of project poorly estimated resulting in over runs and increased costs
  • Indaequate planning and co-ordination of resources
  • Insuffiecient measurables and lack of control over progress
  • Lack of quality control Gives firm framework of accountability and responsibility and is guided by the following principles:
  • Projects are finite with definite start and end date
  • All projects require management to be successful
  • Commitment follows clear need, clear objectives, clear outcomes and clear responsibilities to deliver this. 1.2 Benefits of using PRINCE2
  • Method is repeatable
  • Method is tachable
  • Builds on experience
  • Clarity about what to expect, where, how and when
  • Gives early warning of problems
  • Proactive but can cope with sudden unexpected events Projects may exist in isolation or in relation with each other. Provide organisation with:
  • Controlled management of change in terms of investment and ROI
  • Active involvement of users and stakeholdes ensures project will meet business, functional, environmentsal, service and management requirements.
  • Approach distinquishes Poject Management from product development and uses consistent methodology whatever the project. For managers controls use of resource and better risk management. Embodies proven best practice in project management. Delivers common project language. Formal recognition of responsibilities, why, when and for whom. Provides:
  • Controlled start, middle, end.
  • Regular progress review against Business Case and Plan.
  • Flexible decision points.
  • Management control of deviations from plan.
  • Involvement of management and stakeholders at right time in project.
  • Good communication channels between project management team and rest of organisation.
  • Agreed quality criteria at outset and continuous monitoring against quality throughout project. Project Managers are able to:
  • Establish terms of reference at the start of project.
  • Use defined structure for delegation, authority and communication
  • Divide project into manageable stages for accurate planning.
  • Ensure resource commitment from management is part of approval to proceed.
  • Provide regular but brief management reports.
  • Keep meetings with stakeholders to minimum but at vital points for project. Those directly involved in using projects or outcomes are able to:
  • Participate in all decision making.
  • Can be involved on day-to-day basis.
  • Participate in quality checks throughout project.
  • Ensure their requirements are met. Senior management use 'management by exception concept' and let project manager get on with it unless something is forecast to go wrong. Business Case - defines information justification for settingin up, continuing and terminating project by defining why it is undertaken. Can be updated at key points throughout project. Customer - commissioner of work who will bnefit from end results. Product - whatever the project creates or changes. Programme- collection of projects that together achieve beneficial change for organisation. Supplier - group providing specialist resources and skills, goods and services to create required project outcome for customers and users. User - person/group that will use end product. May be synonymous with customer.
  • Pre-Prince2 Course Reading

    Key questions:

  • What are we trying to do?
  • When will we start?
  • What do we need?
  • Can we do it alone or do we need help?
  • How long will it take?
  • How much will it cost? Structured project management gives logical, organised famework following deined steps to identify answers to these questions. Prince2 states a project should have:
  • An organised and controlled start (plan and prepare properly before begining project)
  • An organised and controlled middle (once started keep it on track)
  • An organised and controlled end (once done, tidy up loose ends) Project manager responsible for the organising and controlling. Will select people to work on the project and be responsible for making sure the work is done on time and properly. Draws up the project plans that describe what the poject team will be doing and when they expect to finish. Customer/Executive is the person paying for the project. The person who will use the results or imapacted by the outcome is the user. These two may be synonymous in many projects. Person who provides expertise to do the actual work on the project is the supplier or specialist. All need to be co-ordinated so required outcomes are delivered on budget, on time and to the required quality. Each Prince2 project will have a Project Board made up of customer, user representative and specialist. Customer, Senior User and Senior Supplier respectively. Project Manager reports regularly to the project board. This board is responsible for providing necessary decisions for project to proceed or overcome difficulties. Project Assurance provides independent view of project progress and consists of business, user and specialist viewpoint. Ensures project is viable in terms of costs, beniefits, meeting user requirement and suitable solution is being delivered. Maybe undertaken by project board or seperate group. Aministrative work often completed by Project Managers to sort meetings etc and keep all on track. Method also explains how to manage risk (identify risks and positive or negative impact), quality and control change (preventing change taking project off in wrong direction as people change their minds). Prince2 delivers set of processes to work through to give framework to gather relevant information. Can't deliver project for you.

  • New prescription for mental health: read a good book

    Doctors usually send patients to the pharmacy to get medication, but from tomorrow GPs in one county will be packing people off to the library with prescriptions for self-help books. The Observer 09/01/05

    Saturday, January 08, 2005

    Sleep Comes Down Once More

    Sleep rescues me. Wake in the afternoon, take Cal to get a DVD at Borders, fetch some food from the Supermarket, dislike a pint of gnats piss in a shite bar used mainly as a resting place. Flake out and listen to the FA Cup. Cal wanted the first Bionicle movie. Cook for the family, sort the Times. Start looking at the Prince2 stuff. Want to go back to sleep.

    Morning

    Wake, wash up, clean kitchen, furl news. Get entertained by Cal. Peter Lorre appears on Scooby Doo. Insanity retuns.

    Friday, January 07, 2005

    Ponce2 Adventure

    A day of discussing FoI, the delights of shredding. A bad search. A reasonable search. Bad karma with a Prince2 manual in preparation for next week. Marginal disagreement with George over the legacy docs of the HA. He maintains they are owned by the SHA as successor organisation, my take is they form the organisational memory of the PCT. Warn Jim about my position. Useful debate either way. George mentions Val's new job, now I reckon the kids who have her as a teacher are lucky. She never gives less than 100%. Feel rough. Cook for Monst and Helen. Lonen and Cal driving the pair scatty. I hide upstairs, and in the kitchen. Watch Corrie, the goth story line amuses me. goth is more amusing second time round, mind you it was kind of funny first time round.

    Thursday, January 06, 2005

    Yes M'Lady

    Celebrity Big Brother captures me marginally in it's web tonight. Germaine Greer and Bez, a match made in heaven or what? Feminist icon and well I'm not certain how describe Bez. They ought to get it on just to amuse me. Brigitte Nielson and John McCririck anyone? Then onto a programme about Parkour, they're mad, absolutely loopy, but well impressive to watch. At first I think it's some dodgy Thunderbirds reference, but no it's free running with a French accent. Why no splat sound? Free running the next challenge for Ken? Sesh with the Learning and Development Bureau this morning. Sell them Binleys, flog them the library, gain a bit of joined up working as a result. Convinced I was shite. My get up and go had got up and gone. Dunno, it might have been better from the receiving end and I'm notoriously poor at judging these things. PM and it's back up to Stockton Heath to talk to the Comms team about Caldicott. I like them it's not a sesh of me telling them about stuff, just a case of light blue touch paper and stand well back. They're opinionated, vocal, challenging and I love 'em for it. Very much a sesh where we work things through together. I have a better idea about where they come from as a result and hats off to them. Home, food veg, interesting life.

    Wednesday, January 05, 2005

    Chuckle Brother

    tPCT and intro to blogs as a simple distriution channel for course material goes down well. In fact the response suprises me, especially as lazy bast here waits til the last minute to pull it all together. CVD, PVD and Diabetes so far, part done and a couple more to do. Sold it to them as a way of driving people to their site. First FoI request comes in. Cool something to get me over the panic. Second follows on shortly. PM and I scare the bejasus out of the NPFiT leads with FoI. Hold Andrew up as a shining example mainly because he is, and I like the geezer. Dawns on them that the journos are out to get them. Northern club comic from CSC is there. States there view is they are private sector and therefore exempt from FoI. They've slapped commercial in confidence on their documentation. Personally I'd be tempted to probe that because I don't think it holds water. Something to look up. Take public money you sell your soul to the public sector. Phil Cribb sent some stuff from the NPFiT people demanding any FoI requests about NPFiT be sent to them. Send a mail back suggesting this misses the point and I think the story lies in the difference between national vision and local reality. Phill gets where I'm coming from, to be fair. Agree best course of action is follow local procedures and inform NPfIT. Home, Monst's doctors note to Faz and back home. Wash up and blog, watch dodgy Mel Gibson film.

    Tuesday, January 04, 2005

    It's Real

    By the time I get back to Hammy House, Tracy announces her proposed date to go on Mat leave. Suddenly the whole thing seems more real. Stupid really because it isn't news. Me being me I go into marginal planning mode which as ever involves chatting with Sally and Christina because there about when I need to chat and will go into a similar stage with Tracy herself tomorrow. Less concerned with covering Tracy's role because Sally is more than able to step into the breach there. More concerned with the gap left by Sally covering the Tracy role. Oh, non-existent deities, mental meltdown. Meanwhile start looking at what Dave's achieving and he's making a difference. The cataloguing backlog is begining to get shifted. Need to chat that through with Tracy. Not said so before but I'm impressed.

    FoI Where?

    Get back to Hammy House and Judy Baillie calls with an FoI request, turns out to be a DPA request at organisations other than us. Chat to the geezer concerened, more to reassure him someone cares (yes I do, I really do, honest guv!) Give him the details on response times etc. Jean Scott calls..... er, no it's not an FoI gig either just some board paper Andy and I were putting together and completely forgot. All a bit dissapointing really. Big sense of anticlimax. That'll teach me to stress myself about things. Meanwhile elsewhere queries about freemasonary are flooding the land. I'm fine, no rolling up of trouser legs for me. Bump into the ever lovely Kate Ardern who is now Public Health Supremo at Stockton Heath, a good move away from the night of the long knives here I think. As ever a delight to chat to.

    FoI D-Day

    Awake with rising panic, today FoI hits. Will we be quiet or inundated with requests. Prob one, can I remember the consignit url. Can I heck as like, Tracy rescues me from that one. Run time error stops play. Corin sorts that one and it's take two and I set the live system up. Get in no requests. Can't work out if I'm majorly relieved or kinda dissapointed. Phones die on the SHA. Update FoI action plan which is cool for 1-2-1 with Jim who runs off at appointed time to see HCLU. I'm chilled so that's not a prob. Will catch him as and when it's convenient to him.

    Monday, January 03, 2005

    Seperated by a Few Years and a Turned Up Walkman

    'Bend It Like Beckham' suprisingly captures Monst's attention. It mildly amuses me and right now anything making me smile feels pretty good. Tomorrow the can of worms opens. Am I walking in to huge numbers of requests or absolutely nothing? Just don't have a clue what demand is going to be like.

    As a London railway station you were cursed

    Got to batter the batter for the Yorshire and away I go. Start noodling with the Information directory just another 1200 keywords to go. Vini Reilly provides the backing chunes and very nice they are too. Not intrusive but condusive to the dodgy identification of content you've not seen. To say the job is rough would be the understatement of the century. Needs pushing through and to be away in Wirral by the morning. Beer kinda helps as well but can't see the SHA being keen on me havng a sup while with them in the morning. Need to set up users too. Planning on using Athens user names and passwords. Makes life easier for people remembering etc.

    Asparagus Next Left

    Decs come down today and once more I head up into the loft. Lovely, my favourite place to be in the house, I love all that tiptoeing along the rafters.... er maybe not. Still job done, mainly by Monst it must be said who has infinitely more patience for packing the things away than I have. Nice to have the house back to something approaching normal again. Monst and Cal headed out pm to leave me to create havoc with the hoover. So a yodeling we go (if the reference makes no sense to you listen to more Soft Boys). Deep joy. Anyway the house is done and Monst is whinging less about the state of the place as a result. Leaving me to get on with the cooking. Should finish this information directory I suppose. But leaving that aas a last minute jaunt. Visit the Half Man Half Biscuit Site and download their last Peel session. The Mick Wall tribute to Peel is affectionate and this kind of results from this. That and how can I resist a number called 'Joy Division Oven Gloves'. Check out their audio page for downloads.