Tuesday, January 11, 2005

Ongoing notes on Prince2 Manual Chapter 4 - Long story don't ask

Starting up a Project (SU) 4.1 Fundamental Principles

  • Must be a basic business requirement to trigger project. This must be viable.
  • Nothing can be done on project until responsibilities are defined and key roles filled.
  • Base information is needed for rational commissioning of a project.
  • Initiation Stage Plan must be submitted for approval before initiation stage is entered. 4.2 Context This is the first process in PRINCE and project begins once this process is conducted and the Project Board approve commencement of Project Initiation. Leads to Authorising Initiation (DP 1). Project Mandate triggers project usually out of corporate or programme management. May be verbal to complete Project Brief. Assumes information on reason for project already exists. 4.3 Process Description Production of 6 key elements key to process:
  • Design and appointment of project management team.
  • Ensuring information for project brief is available.
  • Establishing the project approach.
  • Establishing the customers quality expectations.
  • Setting up a Risk Log.
  • Creating the Initiation Stage Plan. Objective to enable a controlled start by ensuring:
  • Necessary Project Management Authorities.
  • Sufficient information is available to formalise terms of reference.
  • Appoint individuals to undertake project initiation and key Project Management roles.
  • Project Initiation is planned.
  • Organisation hosting project is informed of its existence and implications. Begins with external definition of problem or opportunity the project must satisfy the Project Mandate. Project Approach explaining way it is intended end products will be produced will help with Initiation Stage Plan. If part of a programme the programme will provide a Project Brief and Project Approach and appoint some or all of the Project Board. Much interplay between assembling project team, agreeing terms of reference and project approach. Target work location is informed and logistical support sorted. 4.3.1 Scalability Various approaches to this proces:
  • Stand alone project, all steps apply.
  • Part of programme then Project Brief or PID passed down, Project Board may be defined, Project Approach and Risk Log controlled at programme level. Just need to check if additional work required.
  • If small project requires less formal handling but should be completed. 4.4 Appointing a Project Board Executive and Project Manager 4.4.1 Fundemental Principles Need decision maker and someone to undertake the project. 4.4.2 Context Must plan initiation before initiation work begins requires appointment of executive and project manager. 4.4.3 Process Description Objectives of process are:
  • Identify Executive from stakeholders.
  • Identify most appropriate Project Manager.
  • Confirm selected peoples availability, acceptance and commitment.
  • Appoint people to respective roles. Requires Project Mandate. Must:
  • Ratify key elements of project mandate.
  • Establish missing information.
  • Identify candidates for Executive and Project Manager.
  • Establish responsibilities of each role.
  • Appoint Executive.
  • Appoint Project Manager.
  • Confirm appointments via agreement to job descriptions by corporate or programme management and appointees. Mandate should indicate type of project, its size and complexity, political and business sensitivity. This will help identify candidates for Project Manager role. May include draft Project Plan. 4.4.4 Responsibilities Corporate or programme management. 4.4.5 Information Needs
  • Project Mandate (Input/Update) Project Trigger
  • Agreed job descriptions for Executive and Project Manager (Output) Basis for sign up by both.
  • Appoint Executive and Project Manager (Output) 4.4.6 Key Criteria
  • If part of programme will programme management team fulfil any roles of project board?
  • Does proposed Executive have financial and functional authority neccesary?
  • Has availability of candidates been measured against forecast duration of project?
  • Are candidates likely to change job? If so has this been taken into consideration?
  • Do appointees have necessary skills and knowledge to undertake tasks? 4.5 Designing a Project Management Team 4.5.1 Fundemental Principles
  • Need right people with authority, reponsibility and knowledge to make timely decisions.
  • Need to reflect interests of all parties involved, business, user and supplier.
  • Requires range of resources and skills must be part of tem.
  • Consider all aspects required, fill all roles identifies in Organisation. 4.5.2 Context Review size and complexity and areas impacted by final outcome. Will overlap with appointing project team. 4.5.3 Process Description Objectives:
  • Design team appropriate to size of project.
  • Identify candidates to produce recommended project team.
  • Determine resposibilites and skills for each role.
  • Where part of programme Project Board may be appointed. Otherwise left to Executive. Organisation and Project Management Team Roles should be used as basis for process. Must:
  • Identify candidates for Project Board and create job descriptions.
  • Assess if Project Board members are likely to delegate assurance roles (allows Project Manager to advise on design of assurance roles).
  • Consider seperate Team Managers are required or Project Manager will fulfill this role.
  • Examine Project Manager role definition and need for support roles.
  • Assign candidate names for all roles. Define if shared, combined roles.
  • Identify who should approve roles. 4.5.4 Responsibilities Joint responsibility of Executive and Project Manager for design. 4.5.5 Information Needs
  • Agreed Executive and Project Manager Job Descriptions (Input) Specifies agreed responsibilities to avoid gaps/overlaps.
  • Project Mandate (Input)

  • Now the End is in Sight I'm so Tired, Laying Awake at Night so Wired

    Sleep and I fight for a while. Wake at 4 which is positive in it means I can get some stuff done but a pain in terms of rest. Dash for train beckons so I can have time to do stuff at the Mancy end of the journey with decent coffee and joy in my heart...... Oh, I'm such a fucking cosmopolitan culchee me!

    Monday, January 10, 2005

    Prince2 Homework - Appendix B from Manual

    Project Team Roles Project Board Approves major plans and authorises major deviations from agreed stage plans. Authority that signs off each stage and authorises next stage. Ensures required resources and arbitrates conflict or negotiates solutions between project and external bodies. Approves appointment and responsibilities of the Project Manager. Has following responsibilities that need tailoring project by project:

  • Approves start of project by accepting Project Brief.
  • Agrees with Project Manager their responsibilities and objectives.
  • Confirms with corporate or pogramme management of project tolerences.
  • Specification of external constraints on project such as quality assurance.
  • Approval of accurate and satisfactry Project Initiation Document including that it complies with customer standards and policies and associated contracts with suppliers.
  • Delegation of Project Assurance roles.
  • Commitment of project resources required by next stage plan. As project progresses:
  • Provision of guidance and direction to project ensuring stays within specified constraints.
  • Review completed stages and approve next stage plan.
  • Review and approve stage plans and any exception plans.
  • Ownership of identified risks as allocated at plan approval time - monitors risk and advises Project Manager of changes in status and actions to take to reduce risk.
  • Approval of changes.
  • Compliance with corporate or management directives. At the end of the project:
  • Assurance all produces have been delivered satisfactorily.
  • Assurance acceptance criteria have been met.
  • Approval of nd Project Report.
  • Approval of Lessons Learned Report and passage to appropriate standards group to ensure action.
  • Decisions on recommendations for folow on actions and passage of these to appropriate authorities.
  • Approval where apropriate of Post-Project Review Plan.
  • Project Closure Notificaton to corporate or progamme management. Project Board owns the process Directing a Project DP Ultimately responsible for assuarance that project remains on course to deliver desired outcome of required quality to meet business case defined in PID. Approves and funds changes. Executive Has ultimate responsibility for the project supported by Senior Uer and Senior Supplier. Role is to ensure focus on objectives and delivering product achieving projected benefits. Executive ensures value-for-money balancing demans of business, user and supplier.
  • Oversee development of Project Brief and Business Case
  • Ensures coherent project organisation and logical set of plans.
  • Authorises customer expenditure and set stage tolerances.
  • Monitor control the progress of project at strategic level, in particular reviewing the Business Case continually.
  • Ensure proposed changes of scope, cost, timescale checked against possile effects on Business Case.
  • Ensure risks are tracked and mitigated against.
  • Brief corporate or programme management on project progress.
  • Organise and chair Project Board meetings.
  • Recommend future actions on project to coroporate or programme management if project tolerence exceeded.
  • Approve end project Report and Lessons Learned Report ensure outstanding issues are documented and passed on to appropriate body.
  • Approve sending of project closure to programme or corporate management.
  • Ensure benefits are realised by holding post-project review and forward to review to appropriate stakeholders. Executive responsible for overall business assurance ensuring it stays on target to deliver benefits on schedule within tolerances for budget and schedule. Business assurance covers:
  • Validation and monitring of Business Case against external events and against project progress.
  • Keeping project in line with customer strategies.
  • Monitoring project finance on behalf of the customer.
  • Monitoring business risks to ensure that these are kept under control.
  • Monitor supplier and contractor payments.
  • Monitor changes to Project Plan for impact on Business Case or needs of Business.
  • Assessing impact of potential changes on Business Case or Project Plan.
  • Constraining user and supplier excesses.
  • Informing project of changes caused by programme of which it is part.
  • Monitoring stage and project progress against agreed tolerances. Executive is key decision maker with advice and commitment from others. Senior User Responsible for the specification of te needs of all those who will use the final product, for user liaison with the project team and monitoring the solution meets needs of the Business Case in terms of quality, functionality and ease of use. Represents users to whom product will deliver benefits. Commits user resources aainst requirements. May require more than one person to cover user interests. Shouldn't be too split it isn't effective. Specific Responsibilities are:
  • Ensure desired poject outcome is achieved.
  • Progress towad outcome required by users remains onsistent from user perspective.
  • Promote and maintain focus on desired project outcome.
  • Ensure user resources required by project are released.
  • Approve Product Descriptions for products that act as inputs or outputs from supplier function or that will directly affect them.
  • Ensure products are signed off once completed.
  • Prioritise and contribute user opinions on Project Board decisions on whether to implement recommended changes.
  • Resolve user requirements and prioity conflicts
  • Provide user view on Follow-on Action Reccomendations.
  • Brief and advise user management on all matters concerning project. Assurance responsibilities are:
  • Specification of users needs is accurate, complete and unambiguous.
  • Development of solution at all stages is monitored to meet users needs and progress towrds that.
  • Impact of potential changes is evaluated from user point of view.
  • Risks to users are constantly monitored.
  • Quality checking of product has appropriate user representation.
  • Quality control procedres are used correctly to ensure product meets user requirements.
  • User liaison is functioning effectively. May delegate authority for som assurance responsibilities. Senior Supplier Represents interests of those designing, developing, facilitating, procuring, implementing and possiby operating or maintaining products. accountable for quality of prducts delivered by the supplier. Must have authority to commit or aquire supplier resources In some environments customer may share design authority or have major say in it. May require more than one person to represent suppliers. Specific responsibilities:
  • Agree objectives for supplier activity.
  • Make sure progress towards outcomes is consistent from supplier point of view.
  • Promote and maintain focus on project outcome from supplier management perspective.
  • Ensure supplier resurces required for project are made available.
  • Approve Product Descriptions for supplier products
  • Contribute supplier opinions on Project Board decisions ot implement recommendations on proposed changes.
  • Resolve supplier requirements on priority conflicts.
  • Arbitrate on an resolve supplier priority or resource conflicts.
  • Brief non-technical management on supplier aspects of project. Responsible for specialist integrity of project. Assurance responsibilities are.
  • Advise on selection of development strategy, design and methods.
  • Ensure any supplier and operating standards defined by project are met and used to good effect.
  • Monitor potential change and impact on correctness, completeness and integrity of products against Product Description from supplier perspective.
  • Monitor risks in production aspects of project.
  • Ensure correct use of quality controm procedures so product adheres to requirements. May delegate some assurance responsibility. Project Manager Has authoity to run project on day-to-day basis on behalf of the Project Board within constraints laid down by the board. Prime responsbility to ensure project prduces required products o required standard of quality within specified constraints of time and cost. Responsible for producing result capable of achieving benefits defined in business case. Specific responsibilities:
  • Manage production of required prducts.
  • Direct and motivate project team.
  • Plan and monitor project.
  • Agree delegation and use of Project Assurance roles required by Project Board.
  • Produce PID.
  • Prepare Project, Stage and if neccesary Exception Plans in conjunction with Team Managers and appointed Projecte Assurance and agree them with Projct Board.
  • Manage risks, including development of contingency plans.
  • Liaise with programme management if project part of programme.
  • Liaise with programme management or related projects to ensure no overlooked or duplicated work.
  • Responsible for overall progress and use of resources and initiate corrective action if needed.
  • Responsible for change control and required configuration management.
  • Prepare and report to Project Board through Highlight Reports and End Stage Reports.
  • Liasie with Project Board or appointed Project Assurance on overall direction and integrity of project.
  • Agree technical and quality strategy with appropriate members of project board.
  • Prepare lessons learned Report.
  • Prepare any Follow on-Action Recommendations Report.
  • Prepare End Project Report.
  • Identify and obtain any support or advice required for managment, planning and control of project.
  • Be resopnsible for project admin.
  • Liaise with suppliers or account managers.
  • May also perform Team Manager and Project Support roles. Team Manager Prime responsbility t ensure prodution of products defined by Project Manager to appropriate quality in timescale and at cost acceptable to Project Board. Reports to and takes direction from Project Manager. Specific responsibilities.
  • Prepare plans for teams work and agree with Project Manager.
  • Recieve authorisation fro Project Manager to create products.
  • Manage the team.
  • Direct, motivate, plan and monitor teams work.
  • Take repsonsibility for progess of team's work and use of team resources and initieate corrective action within constraints aid down by Project Manager.
  • Advise Project Manager of deviations from plan, reccomend action, help prepare Exception plans.
  • Pass back to Project Manager products completed and approved in line with Work Package Plan.
  • Ensure project issues reported to person maintaining Issue Log.
  • Ensure evaluation of any Project Issues that arise in teams work and recommend actions to Project Manager.
  • Liaise with any Project Assurance roles.
  • Attend stage assessments as directed by Project Manager.
  • Arrange with lead team checkpoint meetings and produce Checpoint Reports aas agreed with Project Manager.
  • Ensure quality controls of team's work are planned and perfored correctly.
  • Ensure appropriate entries in Quality Log.
  • Maintain and ensure existence of team files.
  • Identify and advise roject Manager of risks associated with Work Package.
  • Ensure all identified risks are entered in risk log.
  • Manage specif risks as directed by Project Manager. Project Assurance Covers all interests in project, business, user, supplier. Must be independent of Project Manager, Project Board can not delegate responsibilities in this area to Project Manager. Specific responsibilities need to answer the question What is to be assured, may include:
  • Maintainence of thorough liaison throughout project netween supplier and customer.
  • User needs and expectations are met and managed.
  • Risks are controlled.
  • Adherence to business case.
  • Constant reassessment of value-for-money.
  • Fit with overall strategy of corporation or programme.
  • Right people are being involved.
  • Acceptable solution is being developed.
  • Project remains viable.
  • Scope of project is not 'creeping upwards' unnnoticed.
  • Focus on business need.
  • Internal and external communications are working.
  • Applicable standards are being used.
  • Legislative containts are observed.
  • Needs of specialist interests (eg. security) are being observed.
  • Adherence to quality assurance standards. Need to check all standards are met don't assume they will be.

  • Quick Post for Fun

    In all the PONCE2 excitement I forgot Single Search Environment went live today on National Library for Health. Mail to Blog seems to be sluggish to say the least so post from lunchtime will appear whenever. My brain hurts and I need to do my PONCE2 homework..... Not inclined to but know I need to.

    Sunday, January 09, 2005

    Bad Karma Beckons

    Curses, don't get the news out of Furl and on to blog. Apologies Sally, my heads full of this PRINCE course and the pre-course reading I should have done on Saturday as well as today. Cold has got heavier. Need a bath before bed because I've spent the day sweating like a pig. Learn the truth about 'Porky Prime Cuts' as a result of radi as I type notes to sink this PRINCE stuff into my head. Beer, pills and bed beckon. Not as rock'n'roll as it sounds the pills are LEMSIP!

    Prince2 Manual - Chapter 3

    3.1 Management Levels 4 parallel management levels:

  • Coporate or programme management is ighest level, outside Project Management it sets the agenda.
  • Directing a Project highest level wthin project completed by Project Board. For key decision making and direction setting.
  • Managing a project- day-to-day planning and control level, largely handled by the project manager.
  • Managing product delivery, hadled by Team Managers. Interact:
  • Higher level processes control lower levels e.g. managing a project creates work package for managing product delivery.
  • Output at lower levels provides inputs that allow higher-level processes to function effectively.

  • Prince2 Manual - Chapter 2

    2.1 What is a Project? A management environment created for the purpose of delivering one or more business products according to a specified business case or a temporary organisation needed to produce a unique and predefined outcome or result at a prespecified time using predefined resources. PRINCE2 Projects therefore have:

  • Finite and defined life cycle
  • Produce defined and measurable business products
  • A corresponding set of activities to achieve the business products
  • Defined amount of resources
  • Organised structure with defined responsibilities to manage the project. May be stand alone or part of a programme. When completed the project is disbanded. The life cycle which is the path and sequence through the various activities to produce the final product. Life span is used to describe the life of the product. 2.2 The scope of PRINCE2 Aspects of existing project management that are proven and excluded from PRINCE2 which may also be used include:
  • People management techniques
  • Generic planning techniques such as Gannt charts and critical path analysis.
  • Risk management techniques.
  • Corporate quality management and assurance mechanisms.
  • Budgetary control and earned value analysis techniques. Covers management of the project and resources involved in undertaking activities of the project. Assumes that project is run within a contract context but excludes specialist areas such as procurement and contracting. These will if required early on increase the importance of a complete and accurate Project Initiation Document (PID). Designed for use on any type of project in any environment but application will vary. Always focussed on delivering specific products to meet specified business case. Benefits are stated in the business case and may be:
  • Financial.
  • Strategic.
  • Legislative. Business case is constatnly reviews and progress measured against defined benefits. New benefits may be discovered along the way but deviations must be controlled through the Project Board. Stakeholders to be involved:
  • Customers
  • Users who will operate final product.
  • Suppliers giving specialist resource
  • Sub-contractors providing products or services to suppliers. Assumes customer will specify desired product and make use of final product and supplier who provide resources and skills to create product. Assumes these are two different parties. Customer participation is key. Configuration management is an essential part of project control focussed on controlling products delivered and knowing where they are at, at any point, their status, who is working on them and the latest version. Risk must be managed, PRINCE incorporate this process. Initiation covers planning and definition of project. May be part of a work programme. PRINCE aimed at middle between high level strategy and specialist techniques to deliver speialist services. Feasibility Studies - may be required under PRINCE2 best handled as seperate project. 2.4 Overview of PRINCE2 Process based approach to project management. 2.5 The processes 8 management processes, key issue is how extensively each of the following should be emplyed within a project: Starting a project - first process. Ensures prereuisites for starting are in place. Expects Project Mandate (high level reason for project and product required). Should be a short process built around the establishment of:
  • Design an appointment of project management team.
  • Project Brief.
  • Project Approach (how solution will be provided).
  • Cusomers quality expectations.
  • Risk log
  • Initiation stage plan. Directing a project - runs from end of Starting Up a Prject until projects closure. Aimed at the Project Board which manages by exception and monitors through report and controls through a number of decision points. Key processes are:
  • Initiation.
  • Stage boundaries (commitment of more resources after checking current results).
  • Ad hoc direction (progress monitoring, advice and guidance, reacting to threats to plans and benefits).
  • Project closure (confirming outcome and controlled close) Initiating a project - objectives are to:
  • Define how required product quality will be achieved
  • Plan and cost project.
  • Document and confirm acceptable Business case for project.
  • Ensure investment of time and effort is justified taking into account risks.
  • Enable and encourage project board to take ownership of project.
  • Provide baseline for decision making processes during project's life.
  • Agree to commitment of resource for next stage of project. Key element is the Project Initiation Document which defines the What, Why, Who, When and How of the project. Also creates blank:
  • Quality log.
  • Issue log.
  • Lessons learned log. Managing stage boundaries - Produces the information on which the Project Board will take key decisions on whether to continue with the project or not. Objectives are:
  • Assure project board that all products lanned in current Stage Plan have been completed as defined.
  • Provide the information to enable Project Board to assess continuing viability.
  • Provide Project Board with other information to aprove current stage's completion and authorise start of next stage together with designated tolerence level.
  • Record any measurements or lessons that can help later stages of project or other projects. Products of process are:
  • End stage report given by Project Manager to Project Board containing Stage achievements.
  • Current Stage Plan actuals, performance against Stage Plan.
  • Next Stage Plan or Exception Plan for which approval is sought.
  • Revised Project Plan
  • Updated Risk Log, used to assess continuing viability of project by the Project Board.
  • Revised Business Case.
  • Lessons Learned Log, updated with lessons from current stage.
  • Changes to structure or staffing of Project Management Team. Controlling a stage - Monitoring and control activities that are the day-to-day management of the project for the Project Manager as htey ensure things stay on course and react to unexpected events. Will be a cycle of:
  • Authorising work to be done.
  • Gathering progress information about work.
  • Watch for changes.
  • Review the situation.
  • Reporting.
  • Taking neccessary corrective action. Process covers these activities and ongoing work on rik and issue management. Cyclic production of the following products occurs:
  • Work packages.
  • Highlight Reports.
  • Project Issues (updated Issue Log).
  • Updated Risk Log.
  • Regularly updated Stage Plan. May also be need for an Exception Report. Managing product delivery - this process ensures that planned prodcts are created and elivered to the project by:
  • Team Manager negotiating Work Packages with the Project Manager.
  • Ensuring all work on products allocated to the team is authorised and agreed.
  • Ensuring that work conforms to requirements and interfacces agreed in Work Package.
  • Ensuring work is done.
  • Assessing work progress and forecasts regularly.
  • Ensuring products meet quality criteria.
  • Obtaining approval for completed products. Products created or updated include:
  • Team plans.
  • Quality logs - giving Project Manager view of the quality of work done.
  • Project Issues (updating Business Case)
  • Risk Log updates.
  • Checkpoint Reports, regular reports form Team Manager to the Project Manager. Closing a project - executes a controlld close to the project. Covers the Project Manager's work as wrap up at end or at premature closure. Most of the work is to prepare input into Project Board for confirmation prject may close. Objectives are therefore:
  • Check extent to which PID aims and objectives have been met.
  • Confirm customers acceptance of products.
  • Assess the extent to which expected products have been handed over and accepted by customer.
  • Confirm maintenance and operation arrangements are in place (including relevant training).
  • Make recommendations for future work (Fillow-on Action Recommendations)
  • Capture lessons resulting project and complete Lessons Learned Report.
  • Prepare End Project Report.
  • Prepare Post Project Review Plan.
  • Archive the Project files.
  • Notify host organisation od intention to disban project organisation an release the resources (nd project notification). Planning - repeatable process with important role in:
  • Planning an Initiation Stage.
  • Planning a Project.
  • Planning a Stage.
  • Updating a Project Plan.
  • Accepting a Work Package.
  • Producing an Exception Plan. Apart from plan, process produces:
  • Product checklist a table of products to be produced by work planned with space for planned and actual dates for delivery of draft quality checked and approved products.
  • Risk Log updated with risk situations arising out of planning activity. Business case - viable business case main control condition of a PRINCE2 Project. Verified by Project Board before the project begins and at every major decision stage. Project is stopped if viability dissapears Organisation - PRINCE2 provides structure for Project Management team and definition of repsonsibilites and relationships. These roles can be combined and shared depending on size of project. Plans - PRINCE2 offers series of plan levels tailored to size and project needs based on products not activities. Controls - PRINCE2 provides set of controls to facilitate key decision making information to pre-empt problems. Split into stages to define review and commitment points. Management of Risk - PRINCE2 defines key moements for review of risk and outlines anaysis and management of risk and tracks progress. Quality in a Project Environment - PRINCE2 recognisies the importance of quality and incorporates it in management. Begins with customer and by laying down standards and inspection methods and checks they are used. Configuration Management - Tracking components of final product and versions. PRINCE2 defines essential facilities and information requirements for configuration management method and linkage to other PRINCE2 techniques and components. Change Control - PRINCE2 emphasises need for change control enforced by change control technique and identification of processes that apply to change control. Techniques - left open to be used as appropriate but does detail:
  • Product based planning.
  • Change control.
  • Quality Review.

  • Prince2 Manual - Chapter 1

    PRINCE (PRojects IN Controlled Environments) is a structured method for Project Management and provides the de facto standard for UK Government projects. 1.1 Why Use a Project Management Method? Reduce risk of project failure as a result of:

  • Lack of vaid business case
  • Insuffient attention to quality
  • Ill defined outcomes
  • Poor communication with stakeholders
  • Badly defined project management roles and responsibilities resulting in lack of direction and poor decision making
  • Costs and duration of project poorly estimated resulting in over runs and increased costs
  • Indaequate planning and co-ordination of resources
  • Insuffiecient measurables and lack of control over progress
  • Lack of quality control Gives firm framework of accountability and responsibility and is guided by the following principles:
  • Projects are finite with definite start and end date
  • All projects require management to be successful
  • Commitment follows clear need, clear objectives, clear outcomes and clear responsibilities to deliver this. 1.2 Benefits of using PRINCE2
  • Method is repeatable
  • Method is tachable
  • Builds on experience
  • Clarity about what to expect, where, how and when
  • Gives early warning of problems
  • Proactive but can cope with sudden unexpected events Projects may exist in isolation or in relation with each other. Provide organisation with:
  • Controlled management of change in terms of investment and ROI
  • Active involvement of users and stakeholdes ensures project will meet business, functional, environmentsal, service and management requirements.
  • Approach distinquishes Poject Management from product development and uses consistent methodology whatever the project. For managers controls use of resource and better risk management. Embodies proven best practice in project management. Delivers common project language. Formal recognition of responsibilities, why, when and for whom. Provides:
  • Controlled start, middle, end.
  • Regular progress review against Business Case and Plan.
  • Flexible decision points.
  • Management control of deviations from plan.
  • Involvement of management and stakeholders at right time in project.
  • Good communication channels between project management team and rest of organisation.
  • Agreed quality criteria at outset and continuous monitoring against quality throughout project. Project Managers are able to:
  • Establish terms of reference at the start of project.
  • Use defined structure for delegation, authority and communication
  • Divide project into manageable stages for accurate planning.
  • Ensure resource commitment from management is part of approval to proceed.
  • Provide regular but brief management reports.
  • Keep meetings with stakeholders to minimum but at vital points for project. Those directly involved in using projects or outcomes are able to:
  • Participate in all decision making.
  • Can be involved on day-to-day basis.
  • Participate in quality checks throughout project.
  • Ensure their requirements are met. Senior management use 'management by exception concept' and let project manager get on with it unless something is forecast to go wrong. Business Case - defines information justification for settingin up, continuing and terminating project by defining why it is undertaken. Can be updated at key points throughout project. Customer - commissioner of work who will bnefit from end results. Product - whatever the project creates or changes. Programme- collection of projects that together achieve beneficial change for organisation. Supplier - group providing specialist resources and skills, goods and services to create required project outcome for customers and users. User - person/group that will use end product. May be synonymous with customer.
  • Pre-Prince2 Course Reading

    Key questions:

  • What are we trying to do?
  • When will we start?
  • What do we need?
  • Can we do it alone or do we need help?
  • How long will it take?
  • How much will it cost? Structured project management gives logical, organised famework following deined steps to identify answers to these questions. Prince2 states a project should have:
  • An organised and controlled start (plan and prepare properly before begining project)
  • An organised and controlled middle (once started keep it on track)
  • An organised and controlled end (once done, tidy up loose ends) Project manager responsible for the organising and controlling. Will select people to work on the project and be responsible for making sure the work is done on time and properly. Draws up the project plans that describe what the poject team will be doing and when they expect to finish. Customer/Executive is the person paying for the project. The person who will use the results or imapacted by the outcome is the user. These two may be synonymous in many projects. Person who provides expertise to do the actual work on the project is the supplier or specialist. All need to be co-ordinated so required outcomes are delivered on budget, on time and to the required quality. Each Prince2 project will have a Project Board made up of customer, user representative and specialist. Customer, Senior User and Senior Supplier respectively. Project Manager reports regularly to the project board. This board is responsible for providing necessary decisions for project to proceed or overcome difficulties. Project Assurance provides independent view of project progress and consists of business, user and specialist viewpoint. Ensures project is viable in terms of costs, beniefits, meeting user requirement and suitable solution is being delivered. Maybe undertaken by project board or seperate group. Aministrative work often completed by Project Managers to sort meetings etc and keep all on track. Method also explains how to manage risk (identify risks and positive or negative impact), quality and control change (preventing change taking project off in wrong direction as people change their minds). Prince2 delivers set of processes to work through to give framework to gather relevant information. Can't deliver project for you.

  • New prescription for mental health: read a good book

    Doctors usually send patients to the pharmacy to get medication, but from tomorrow GPs in one county will be packing people off to the library with prescriptions for self-help books. The Observer 09/01/05

    Saturday, January 08, 2005

    Sleep Comes Down Once More

    Sleep rescues me. Wake in the afternoon, take Cal to get a DVD at Borders, fetch some food from the Supermarket, dislike a pint of gnats piss in a shite bar used mainly as a resting place. Flake out and listen to the FA Cup. Cal wanted the first Bionicle movie. Cook for the family, sort the Times. Start looking at the Prince2 stuff. Want to go back to sleep.

    Morning

    Wake, wash up, clean kitchen, furl news. Get entertained by Cal. Peter Lorre appears on Scooby Doo. Insanity retuns.

    Friday, January 07, 2005

    Ponce2 Adventure

    A day of discussing FoI, the delights of shredding. A bad search. A reasonable search. Bad karma with a Prince2 manual in preparation for next week. Marginal disagreement with George over the legacy docs of the HA. He maintains they are owned by the SHA as successor organisation, my take is they form the organisational memory of the PCT. Warn Jim about my position. Useful debate either way. George mentions Val's new job, now I reckon the kids who have her as a teacher are lucky. She never gives less than 100%. Feel rough. Cook for Monst and Helen. Lonen and Cal driving the pair scatty. I hide upstairs, and in the kitchen. Watch Corrie, the goth story line amuses me. goth is more amusing second time round, mind you it was kind of funny first time round.

    Thursday, January 06, 2005

    Yes M'Lady

    Celebrity Big Brother captures me marginally in it's web tonight. Germaine Greer and Bez, a match made in heaven or what? Feminist icon and well I'm not certain how describe Bez. They ought to get it on just to amuse me. Brigitte Nielson and John McCririck anyone? Then onto a programme about Parkour, they're mad, absolutely loopy, but well impressive to watch. At first I think it's some dodgy Thunderbirds reference, but no it's free running with a French accent. Why no splat sound? Free running the next challenge for Ken? Sesh with the Learning and Development Bureau this morning. Sell them Binleys, flog them the library, gain a bit of joined up working as a result. Convinced I was shite. My get up and go had got up and gone. Dunno, it might have been better from the receiving end and I'm notoriously poor at judging these things. PM and it's back up to Stockton Heath to talk to the Comms team about Caldicott. I like them it's not a sesh of me telling them about stuff, just a case of light blue touch paper and stand well back. They're opinionated, vocal, challenging and I love 'em for it. Very much a sesh where we work things through together. I have a better idea about where they come from as a result and hats off to them. Home, food veg, interesting life.

    Wednesday, January 05, 2005

    Chuckle Brother

    tPCT and intro to blogs as a simple distriution channel for course material goes down well. In fact the response suprises me, especially as lazy bast here waits til the last minute to pull it all together. CVD, PVD and Diabetes so far, part done and a couple more to do. Sold it to them as a way of driving people to their site. First FoI request comes in. Cool something to get me over the panic. Second follows on shortly. PM and I scare the bejasus out of the NPFiT leads with FoI. Hold Andrew up as a shining example mainly because he is, and I like the geezer. Dawns on them that the journos are out to get them. Northern club comic from CSC is there. States there view is they are private sector and therefore exempt from FoI. They've slapped commercial in confidence on their documentation. Personally I'd be tempted to probe that because I don't think it holds water. Something to look up. Take public money you sell your soul to the public sector. Phil Cribb sent some stuff from the NPFiT people demanding any FoI requests about NPFiT be sent to them. Send a mail back suggesting this misses the point and I think the story lies in the difference between national vision and local reality. Phill gets where I'm coming from, to be fair. Agree best course of action is follow local procedures and inform NPfIT. Home, Monst's doctors note to Faz and back home. Wash up and blog, watch dodgy Mel Gibson film.

    Tuesday, January 04, 2005

    It's Real

    By the time I get back to Hammy House, Tracy announces her proposed date to go on Mat leave. Suddenly the whole thing seems more real. Stupid really because it isn't news. Me being me I go into marginal planning mode which as ever involves chatting with Sally and Christina because there about when I need to chat and will go into a similar stage with Tracy herself tomorrow. Less concerned with covering Tracy's role because Sally is more than able to step into the breach there. More concerned with the gap left by Sally covering the Tracy role. Oh, non-existent deities, mental meltdown. Meanwhile start looking at what Dave's achieving and he's making a difference. The cataloguing backlog is begining to get shifted. Need to chat that through with Tracy. Not said so before but I'm impressed.

    FoI Where?

    Get back to Hammy House and Judy Baillie calls with an FoI request, turns out to be a DPA request at organisations other than us. Chat to the geezer concerened, more to reassure him someone cares (yes I do, I really do, honest guv!) Give him the details on response times etc. Jean Scott calls..... er, no it's not an FoI gig either just some board paper Andy and I were putting together and completely forgot. All a bit dissapointing really. Big sense of anticlimax. That'll teach me to stress myself about things. Meanwhile elsewhere queries about freemasonary are flooding the land. I'm fine, no rolling up of trouser legs for me. Bump into the ever lovely Kate Ardern who is now Public Health Supremo at Stockton Heath, a good move away from the night of the long knives here I think. As ever a delight to chat to.

    FoI D-Day

    Awake with rising panic, today FoI hits. Will we be quiet or inundated with requests. Prob one, can I remember the consignit url. Can I heck as like, Tracy rescues me from that one. Run time error stops play. Corin sorts that one and it's take two and I set the live system up. Get in no requests. Can't work out if I'm majorly relieved or kinda dissapointed. Phones die on the SHA. Update FoI action plan which is cool for 1-2-1 with Jim who runs off at appointed time to see HCLU. I'm chilled so that's not a prob. Will catch him as and when it's convenient to him.

    Monday, January 03, 2005

    Seperated by a Few Years and a Turned Up Walkman

    'Bend It Like Beckham' suprisingly captures Monst's attention. It mildly amuses me and right now anything making me smile feels pretty good. Tomorrow the can of worms opens. Am I walking in to huge numbers of requests or absolutely nothing? Just don't have a clue what demand is going to be like.

    As a London railway station you were cursed

    Got to batter the batter for the Yorshire and away I go. Start noodling with the Information directory just another 1200 keywords to go. Vini Reilly provides the backing chunes and very nice they are too. Not intrusive but condusive to the dodgy identification of content you've not seen. To say the job is rough would be the understatement of the century. Needs pushing through and to be away in Wirral by the morning. Beer kinda helps as well but can't see the SHA being keen on me havng a sup while with them in the morning. Need to set up users too. Planning on using Athens user names and passwords. Makes life easier for people remembering etc.

    Asparagus Next Left

    Decs come down today and once more I head up into the loft. Lovely, my favourite place to be in the house, I love all that tiptoeing along the rafters.... er maybe not. Still job done, mainly by Monst it must be said who has infinitely more patience for packing the things away than I have. Nice to have the house back to something approaching normal again. Monst and Cal headed out pm to leave me to create havoc with the hoover. So a yodeling we go (if the reference makes no sense to you listen to more Soft Boys). Deep joy. Anyway the house is done and Monst is whinging less about the state of the place as a result. Leaving me to get on with the cooking. Should finish this information directory I suppose. But leaving that aas a last minute jaunt. Visit the Half Man Half Biscuit Site and download their last Peel session. The Mick Wall tribute to Peel is affectionate and this kind of results from this. That and how can I resist a number called 'Joy Division Oven Gloves'. Check out their audio page for downloads.

    Sunday, January 02, 2005

    More Wittering

    Ken notes the abnormal amount of Sundays (or at least the feeling that there are an abnormal number of Sundays in the week) this week, perhaps that explains why I'm feeling miserable. A solution is sought in a bottle of Brakspears, cooling away right now in the hope that a taste of a home based brew might cheer me up. For some reason my brain is saying an Old Mother Riley film would go down well. It's not even an option. I know as well it'd be comfort viewing. Go for something familiar unchallenging and amusing in a music hall sort of sense. Nearest I can get is a St. Trinian's movie. Which reminds me the National Archives have released the POW questionnaires filled in post release. Included is Ronald Searle's amongst other famous examples. Another past interest comes to the surface.

    Swedish Chef's Mutterings

    Monst quizzes me again about FoI. Worried about the interface between FoI and DPA. Well that makes two of us. The impression the press seems to be trying to gve at the moment is that everything will be avaialable and that privacy rights are disappearing. Not so. Keeps me on my toes I suppose. Much of the day spent in the house, nip out to Asda for Bionicle's for Cal with some of his Christmas money and a bit of food for us. Back home and Cal wants to cook cookies. So that's what we do. Cooking with Cal is always fun. He gets excited about having the bowl and the end results. Cool.

    You can hum the theme tune yourself

    Match of the Day and I see Liverpool robbed, Everton stuffed by the scum (is this the wheels coming off the Everton trolly - poor Sam Howlin if it is) before Arsenal take on the Addicks. Litened to it earlier, nice turn by Freddie for goal 1, Cesc Fabregas continues to impress and I like van Persie's attitude, nicely combatative, nice goal too. Scoreline flatered them though. Slight added template tinkering. More tidying up really. Need to get out of the house tomorrow. Should have gone out today but rotten weather stopped play. Need to find an indoor energy burner for rain stops play risk. Steak pie went down well with Monst. Look increasingly like I get a gig transporting Monst's Aunt Margaret to visit her daughter's grave in the Cotswolds some time this year. Fun! Not a hassle, I'll use it as an excuse to go and spend some time at home.

    Saturday, January 01, 2005

    Bits and Pieces

    Bizarre bit of radio on the way home the other day. Dave Gorman talking about his Googlewhack Experience mentioned a site Women and Dogs, claiming it was a site worth visiting and safe fo the work environment. Must have been sufficiently interesting for me to visit the odd little site today. So if you want to see a collection of pictures of women and dogs go along yourself. Odd, just freakily odd. As promised it was safe for a working environment too, which kinda shocked me. Other toy of choice today is a Gigablast site search in the hope it finds stuff without me having to go into blogger to do the job. The google site search dn't seem so great.

    Morning All

    So Ella Guru made the Festive 50. House and quiet apart from a Hefner mp3 which has just lanched. Cal wakes and fixes himself some food. Breakfast, blog, news, 2005 continues as normal then.

    Grumpy Git Starts a New Year Again!

    20 minutes into the explosion of New Year off of Okell Drive and I begin my annual rant about gits with fireworks threatening to wake Cal but for once Monst is here to witness it. Pint of ESB to see the new year in, the first of many throughout the year no doubt. Jools Holland's Hootenanny is disturbed by the fireworks too. Next year stay inside, enjoy the music although it must be said much of it this year leaves me cold. Franz Ferdinand are the only band that interest me if truth be told.

    Friday, December 31, 2004

    Bye-bye 2004, Hello 2005

    Happy new year if you wander in. Thanks to Dave at work and Librarywebbie for reminding me! Home, feed the family, Monst feeling rough still, shove grog into chill for a drink to see the new year in but my heart ain't exactly in it. Just another day. Suspect the drink might be a bit of a solo effort as ill health stops play. Lunchtime walkabout and its time to get steak for the trad steak pie for tomorrow. Also time to lose the last of the vouchers. Prole shop to rid myself of voucher curse: Durutti Column 'Vinni Reilly' Andy Partridge 'Fuzzy Warbles Vol.2' Carter the Unstoppable Sex Machine 'Starry Eyed and Bollock Naked' A weird mix I'll grant you but some interesting stuff nevertheless. Couple of books 'Hawkwood: Diabolical Englishman' and 'The Double Life of Doctor Lopez: Spies, Shakespeare and the Plot to Poison Elizabeth I' and that ends the voucher purchasing. My days of seriously heavy history are beyond me, has to be something that interests me although the Hawkwood is odd because I don' really do medieval history at all. The Elizabethan stuff is familiar territory though. 2/3rds information directory complete, the WDC stuff just ain't readable so need to remember to call Suzy Ning in the new year. To sort that ASAP. Dave and I bugger off lunchtime. Nothing doing, and the rest of the building seemed to have gone.

    Nice Weather for Ducks - Yeah, Right

    Day starts badly when I can't locate some vital docs, eventually locate them (the perils of tidying up - can never find a bloody thing, particularly when you last did it months ago). More and more spooked by the press attention, shite this could eat more of my time than I've anticipate. Even the sodding Echo are getting in on the act. BMA Library call they've sent us the wrong video, to check I open the parcels that have just been delivered by John the Post (the younger version). Need a set of bolt cutters to get into the bloody things. Sure enough the wrong one is here and needs returning. Coffee, blog and back to listing. Great........ that lot'll be easy to find stuff in.....

    Thursday, December 30, 2004

    Mr. Michelin May Be a Resident Round Here

    So to home. shattered. Get the delights of changing the bedding, so once more I fight with the duvet to get it in its cover. I'm convinced the thing has a life of its own. You slip the corners into the corners of the cover and by the time you've got ready to sort the other set it's moved. Eventually I pin the slippery critter down. Thank non-existent deities for fitted sheets. No hospital corners for this incompetent to mess up. Food is interesting, I'm hungry but wary of over doing the food thing. I eat a little rice and a bit of a chinese but don't do it justice. Still it has all stayed where it is meant to. Veg in front of TV. Monst watches Taggart, it's kinda a family ritual thing

    Blog Gone

    Second half of Fade the Blog goes out, much relief on my part. Getting spooked by the volume of FoI coverage, will this lead to much work? Letter forwarded to me from the SHA from the Audit Commission which amongst other things talks about a relationship manager. Great get a request from them and they want to date you. Anyway, blog breather over back to work.....

    Back at Work

    Yesterday largely spent in bed with lots of fitful dozing. It's the safest course of action, I don't do ill very well so hiding from the family is better for them and better for me. Felt extremely rough. Relieved this morning when the only after affects seem to be an aching back. Still not eaten any food but have moved onto tea from water. Head into work. Relieved to be back. Plan for the day is to listen to the last day of the Test Match. Blog and sort information directory. Just had a nasty blog experience. Edited the entry for Fade the Blog and lost the best part of a morning's editing. Not happy. Gonna have a break from it and return to it later. Aaaaaaaargh!

    Wednesday, December 29, 2004

    Ugh!

    The upturned telephone is my friend. I cuddle it, and feed it. I don't make work. Do a little light work here in bursts. I suspect the demand on the service would have been light anyway. Feel guilty.

    Duke of Hurl

    Callum, generous child he is has shared whatever is causing him to hurl with me. No inspection of the contents of my stomach but feel slightly better following the experience. However I expect an encore later. Lovely.

    Tuesday, December 28, 2004

    Elegant Chaos

    Julian Cope on 6 Music tonight chatting to Tom Robinson on the Evening Sequence. Interesting on Bill Drummond (Penkiln Burn needs thorough investigating when I get the time - note to self), in fact the whole thing is remarkably lucid. He's flogging new book 'The Megalithic European' (site accompianying book 'The Megalithic European Site') I'm gonna have to pick up a copy along with the 'Modern Antiquarian' ('Modern Antiquarian Site')much as I've resisted the latter. Head Heritage is a site I only occaisionally wander over to so the RSS feed is nice and means I suspect I will be a more regular visitor. I get the vibe, pre-history which I've always pretty much left alone might come and bite me in the bum and capture a level of fascination I've never invested in it before. Cope and the Bunnymen are I suspect at the heart of the musical family tree that all of the stuff I listen to, so I have an enourmous soft spot for the geezer.

    Bank Holiday II: The Hurl Is Back

    Morning wake earlier than the rest of the house (what a suprise!) Head downstairs, pick up the paltry amount of health news there is around today. Cal comes down. He's feeling better. Great. He has a drink and some toast (don't want to overload is stomach right now). Mission for the day was to get the universal modulator required to hook up the DVD player Kitty bought Cal to an old sans Scart portable TV he has in his room. Trip to Maplin's then to sort that. I'm going stir crazy stuck in the house. Monst wants a curry for dinner tonight so excuse to visit the chinese supermarket to get curry sauce. This gives me an excuse to hit Waterstone's with the vouchers provided for Chrimbo by those who know I enjoy the odd book. Come away with John Peel by Mick Wall, Sue Townsend's 'Adrian Mole and the Weapons of Mass Destruction' and 'The Vesuvius Club: A Lucifer Box Novel' by Mark Gatiss which should be fun. Even better I still have a tenner's worth of token to go. Went to the Prole shop with the token for there but came away with nothing. Maplin's Liverpool fail to provide the requisite Universal Modulator so off to Warrington I go. The Warrington Wolves appear to be playing Widnes Vikings so traffic is shite. Get the modulator and retun home to find Monst and Cal fast a kip. Sort the DVD and head downstairs. Cal wakes up and hurls. Mont is wound up and I shove clothes bedding etc. into washing machine. Clean up and head to supermarket for more antiseptic to drive away the smell of vomit. The house has a smell that old Flo Nightingale would be happy with. Deep joy.

    Monday, December 27, 2004

    Ooops, Work Again

    Nice intro to open access from Peter Suber via librarian.net another case of RSS to the rescue via Librarian Blogs on Blogdigger. Have a suspicion a new years resolution maybe coming out of all of this.

    Bank Holiday Witterings

    PM I fall asleep. I wake up to find myself covered in a travel blanket known to Cal as Cuggie. He'd covered me with it which was realy sweet. He's still not feeling great. Monst isn't speaking, she's squeaking with voice loss and sore throat. Diet returns to more traditional Scots fare tonight. Mince and tatties, so the cooking technique s simple, boil the crap out of some mince and spuds. A little veg on the side will spoil the traditional serving though. Back again to the wonderful RSS Digest and split the feed into its constituent parts and rejig the template so they're there in a more logical place. Kinda wonder if we could tag the obesity stuff for WLSINFO as a kinda freebie bonus service. Thought's Ken? Key question is will Sally be up for it? Cal is hurling again. Great just what I wanted. Thing is he's had a bit of milk to drink and nothing else for the rest of the day. Curdled milk hurl, nice! Watch Pride as I type. Odd mix of nature film and documentary with impressive animation technique from Jim Henson's lot. Lots of lions killing stuff and it having its roots in nature documentaries has the compulsory lions wanting a shag bit too. Nice concept of vegetarian lions in Suki, it'll never catch on. I know this because Cal and I watched the Really Wild Show earlier today. Michaela Strachan romping around with lions and a camera disguised as a rock and one on a wire.

    Morning Blog

    This morning I wake shattered. Cal spent the night hurling. I spent my night mopping up a vomit spattered bathoom Mind you at least he made it to the bathroom. Monst meanwhile has a sore throat and has lost most of her voice (dubious case for celebration then!) Wake early and run around tiying the house. Monst calls, Cal is asleep and I'm loathe to wake him in the circumstances. We agree she'll jump a cab home. Monst calls again to say she's having problems getting a cab and she'll see me when she can. Eventually the hospital supply one. Good thing too. She isn't in work tonight so that's a relief.

    Sunday, December 26, 2004

    Lemon Entry, My Dear Watson

    Our road is doubling as an ice rink right now. The old fella calls. Relief to hear him. The old drear is feeling rough. Not self inflicted sounds like a heavy cold. She's been given a hot toddy and some Finnish cold cure. Meths I guess. Back on the news trail. 'Casualty' in the background on TV. Holby has yet another Christmas day disaster. Dunno why they're suprised, it happens every year. They must have some brilliant disaster planning with all the practice they get. 'Sherlock Holmes and the Case of the Silk Stocking' provides the Boxing Day death mayhem with Victorian class. Good news for dry ice merchants too, mind you they probably nicked some from the Sisters of Mercy.

    Boxing Day I

    A day where Cal and I muck round in the snow early morning. He likes making footprints and throwing snowballs at me. He doesn't like me throwing snowballs at him. The street is a pure sheet of ice. Relieved Monst scored a lift home. Played (Robo Doc and Air Hockey) and did bit of work as the Biederbecke Affair played at me on the DVD. I love it's off beat humour and James Bolam is a fave actor too. Alan Plater stuff all ways bring me delight, a rave-on writer. Just another two discs to go! Huge bowl of goose soup for lunch and I'm sorted. Cal votes with a smaller bowl. For the last couple of weeks I've introduced a news feed to the blog straight off the Furl account we use to create Fade the Blog using the Furl stylesheet. It's always irritated me because it looks messy (despite the fact I inhabit one of the messiest workspaces you'll encounter on a webpage messy irritates me). Anyway introduced RSS Digest to it and it is now much neater. Really happy as a result. Unusually no damage when I've been tinkering with the template. Result. Monst tries to kip, shouts at me for spending too much time on this thing, starts watching the 'Huncback of Notre Dame' with Cal and then heads back to bed. Meanwhile I start cooking again.

    Saturday, December 25, 2004

    Dibley just off of Christmas Common

    Good news, Monst has scored a lift home in the morning. Vicar of Dibley Crimble Special goes down well with me. As does a bottle of Bah Humbug! Cal's fave things from today: 1 Telescope (the neighbours will suspect us of being peeping Tom's - he really wants to look at the stars0 Power Rangers in a variety of flavours Teenage Ninja Turtles Air Hockey Day was full of kids riding new bikes and powered scooters past the house pre-snow. Tomorrow will be full of snowballs.

    Adventures with a bullet proof oven glove

    Monst has a nasty habit of throwing away my oven gloves and a couple of weeks back the oven glove terror struck again. Anyway the result of much whinging was that Monst bought me a new oven glove. She rang to whinge at the cost of the glove but did tell me it was wasable. I then got home to discover that the thing included in its manufacture Kevlar. Great a bullet proof oven glove. Well today it was fully exercised. Goose cooked well and was eaten well and the remains were duly turned into soup. Snow happened. Horrible drive to take Monst to work. Monsts family have called throughout the day but not a peep out of my lot. Presumably as a result of this current unrest. I can't call them because we lost our address book in the summer and I don't have the number. Leave a message on their answer phone in Didcot.

    Friday, December 24, 2004

    Christmas Eve, Carrot for Rudolf, Biscuit for Santa and a Bottle of Brakspears

    Have a cool Yule if you wander in. Day begins at 5.30 with a dash to Asda for petrol. Into Asda at 6.00 for sprouts (they didn't open 'til then). Then off to fetch the Goose from Holly Tree Farm at Tabley. Home via Warrington's Marks and Sparks (vanilla laden custard) and Morrisons in Widnes. Shop for Monst's presents (poorly) in Widnes, phone the Fade crew. Home and bake the bread. Fridge is stuffed to the gills so the paper recycling bin has to be used as a student fridge. All those years at college finally pay off! Radio 6 Helen and Lonen round for Christmas dinner. Monst cooks, nice, Helen and I drink, the kids play and I just get to chill. Nice.

    Thursday, December 23, 2004

    Zzzzzzzzzzzz

    Dissy list failed so need to contact the girls tomorrow to get them to mail it out. Need to fetch the goose, get blog sorted early and sometime in between catch sleep. Feel sleepy, supping Cotswold Way. Blogging.

    Got a web between his toes

    Break the bad news to Axlr8 that they haven't gained our custom around FoI tracking software. Still they'll be in contact to see if Consignit's FiRM is up to the job. Deep joy, something to look forward to then. News is bugging me again, mainly because I didn't crack it earlier, so need to solve later when at home. Rip off the dissy list to see if I can disseminate from home. Still need to buy presents for Monst. Aaaargh! Bloody Christmas. More later when I've calmed down.

    Ouch!

    A MAN whose genitals were hacked off with a knife probably died of fright. That'll be a relief then, I'd hate to think he died of having his genitals hacked off. Local papers full of this sort of thing!

    Wednesday, December 22, 2004

    'Reality,' sa molesworth 2, 'is so unspeakably sordid it make me shudder.'

    Respect to Ian Smith, comes up with not just one but four possible scenarios for solving the problem in front of me. Settle on the solution most ethically sound and with potentially the fastest results, so due to meet a bunch of HR bods in January to solve the issue. Feel happier about things as a result. Abandoned in the afternoon. Get on with information directory for tomorrow. Deep joy. See Fred and co upstairs for information and I'm away......

    Hogwarts and Uvver Stuff as Any Ful Does No

    So the 16th July will necessitate a trip to buy the new Harry Potter book 'Harry Potter and the Half-Blood Prince' so that should cheer up Monst. News blogging early day to the sound of Hefner need to sort HR at meeting with the mysterious Ian Smith (white Rhodesian PM (insert your own expletives to descibe the geezer) who declared UDI? Isn't he dead yet? No, it'll be some old HR Manager that no doubt will demand respect because of his position but will get none til he delivers!) Also need to sort Information Directory for Consignit to be down with them in a partially completed form by the end of the morning and completed by tomorrow. Populates bits of the Enquiry Management system to cope with the flood of FoI requests I'm hoping not to get come Jan 1st. Which reminds me came across this Molesworth site. Cool or what!

    Wey-Wey-Hep-Uh-Hole

    Ying Wah to the rescue, I'm too tired to cook. Thaw not as good as anticipated. Gift situation a little awkward. Bit of a bugger. Monst surfing right now. Role reversal or what. Good news, England win in the cricket.

    Tuesday, December 21, 2004

    Shortest day

    Happy Solstice one and all...... Left the folks at around 5.20 having been plagued by a Symantec installation on the old fellas steam powered PC. Journey up sees me fighting sleep and taking a 15 minute cat nap in Stoke. Great! Hit the SHA and into FoI mode. Corporate Services meeting... interesting. Back to Hammy House. Traffic, gets in the way from Stockton Heath to Liverpool. All the lights were red. Why, because I was expecting a call at two. Murphy's law strikes again. Luckily traffic hit the geezer who was due to call me. Resultant meeting of telephones and I'm talking to a geezer called Keith who sounds just like Rob Brydon. Begin to think I've wandered into an episode of Marion and Jeff with a little CRM prduct thrown in. Spooky. Finally got the message across last night that I'm not joking about how pissed off we are right now. Issue will be raised over Christmas, can't ask fairer than that. Now hope peace breaks out between the folks and Monst. She spoke for a little to the old Drear on the phone last night so that was a plus. Feel a bit happier for now but then I haven't got home yet. Noticed earlier that mail to blog finally turned up.

    Four Acres and a Donkey

    Mail to blog seems to have fallen over again. Bit dismayed right now. In my folks house the downstairs loo came with free bookshelf. My response (I lived with them at the time) was to develop a small collection of lavatorial (or lavatorial humour) books for those caught with a free moment under the stairs. They're still there (pride of place 'Four Acres and a Donkey' the memoirs of a lavatory attendent). Meanwhile upstairs I find a Screwfix catalogue. How perverse can you get than reading about ironmongery? It's sick I tell you!

    Beer, Ticket Money, What Could Possibly Go Wrong?

    Drive to Didcot fine. Play list Hitchcock 'Queen Elvis', Flogging Molly 'Swagger' and the Jazz Butcher 'Illuminate'. All chosen for maximum involvement, minimum thought. Sore 'froat result. Atmosphere in Didcot strained. Or at least it is where I'm sat right now. The old drear needs to go back to work so I don't want to rant if she's gonna get upset. So far then the issue of the day has yet to be brought up. Deep joy.

    Monday, December 20, 2004

    Where have all the posts gone?

    OK so mail to blog posts seem to have failed to arrive anywhere. So what to include in this post? Do I shove in stuff that I didn't post before in case it turns up out of nowhere? Or do I repeat the missing stuff? Opt for the former. Route home, over the Runcorn Bridge, M56, M6, M6 Toll, M42, M40, A34 then I have to come off at Abingdon. Why? Because the ghosts of my past are calling me and I have to see the Thames as well. Abingdon a typically small South Oxon market town with crooked buidings and narrow roads. So the ghosts of swimming trips at the Old Gaol, Cricket matches, meals at the Crown and Thistle when Berni Inns were all the rage and Sara Billington raise their heads. Culham and I cross the river again. Pleasant drive and then Didcot. Still feeling more than slightly depressed about recent events. Everyone avoiding the subject but it needs sorting. Plus side is that I enjoy pleasant food and it is nice to see the folks. Even better my mother irons a shirt for me. Some beer comes my way 'Bah! Humbug!', 'Hobgoblin' and 'Cotswald Way'. Nice. Get in the house and watch some cricket because the folk have no qualms on the Murdoch front. As a result of my habit of listening to the cricket if available I wasn't prepared for Hashim Amla and his beard which W.G. Grace would have been proud of . For those unfamiliar with W.G. pic below should make sense of that.

    Early Moning Mrs Mopp

    This week my aggregator will mainly be reading NLH News (http://nlhnews.blogspot.com/atom.xml) and the NLH Primary Care Question Answering Service (http://www.clinicalanswers.nhs.uk/clinicalanswers.xml). The latter is really interesting but I've yet to work out how to exploit it (theres a debating point for the Fade crew). Just have the feeling we need to be active abouot using it in addition to signposting it. Meanwhile the tidying is moving on at a pace that has allowed me to pur a coffee, blog and relax for twenty minutes. Cool. The result is I learn that Sol Campbell scored his first goal in 16 months yesterday and what a cracker it was.

    Sunday, December 19, 2004

    Choo Choo

    Phone home, arrange tomorrows trip. May involve some hanging around but that's fine, people need to do their thing and I haven't got a clue what the journey is likely to be like given that I'm likely to hit Brum around rush hour. Cal hits bed as soon as we've dropped Monst and returned home. Top Scrapheap Mega Challenge. Cal and I enjoyed it mightily and even Mosnt got vaguely intrigued. Celebrated the 200th anniversary of Richard Trevithick's invention of the steam locomotive. Cool. Should tidy up, wrap the few presents for the folks. Can't really be arsed. Early morning job then. Maybe energy will return shortly.

    Superlambanana Again

    Don't know what horrifies me more the Bid to take Superlambanana to spiritual 'home' in Garston or the demolition of the headquarters of Joseph P Lamb and Sons to replace it with luxury apartments. Strikes me as architectural vandalism. Plus I'll miss the yellow geezer on the way home or to work.

    Mundane

    Cal had a nightmare last night, a Dragon was out to get him. All this at three in the morning. Consequently I'm shattered. Pick Monst up from Faz, get back and cook pancakes as Cal requests. Headache hits. Need to head to the supermarket too. Deep joy.

    Saturday, December 18, 2004

    Othello

    Charlie II on the Beeb in 'Stage Beauty' tonight always worth watching anything vaguely relating to the restoration. A day of keeping Cal amused with a Beetle Drive and a whole heap of fun and games. Play barn and all the while I was trying to sort out tidying bits of the house. Bit of a pain to be honest. News as ever..... Card from Beck. Did not go own well with Monst. A pain. Didcot Monday, deep joy. Catch up with the blogs too.

    Friday, December 17, 2004

    Roots

    Back to the thing that really sold me on librarianship, the nusing professions (before you think this is smutty an explanation is in order - when I did my pre-professional year at the Cairns Library in Oxford, the Poly had just begun their nursing degree, as usual we hadn't got the reading list until too late and being fresh from college this lot had my entire sympathy and empathy, I was hooked). Training session with a bunch of specialist practitioner mentors on information handling skills. Some fave library users and tutor the ever kind Elaine Gilleland. Nice session, bit of storytelling, general academic slagging etc. Good library PR. Morning at SHA. Sort FoI action plan with Jim. Top geezer who I like loads. Confirm a DPA issue that Tracy gave top guidance on with Karl. All this and Laura leaving. Take my leave and dash to Mossley. Consignit sort spreadsheet so I have a full weekend ahead. Cool.

    Thursday, December 16, 2004

    Royal

    Drop Cal off with Monst outside the dental hospital. Head off to find some parking. Discover the former car park is now staff only. Thing is they only tell you once your right on it. Great, so much for the NHS family. End up in the new multi-storey they've built when I finally discover how to get into it. Consequence of this is I need change. Head off and locate a WH Smiths in the hospital which takes me past a display board advertising the library at the Royal, think it's remanents of Health Libraries Week yet to be removed. Kinda impressed but they don't have our sense of style! The other consequence is I get to walk through the bowels of the Royal. Deep joy, a lovely experience. By the time I reach the Dental Hospital Monst and Cal are out. We head to Speke because Monst wants to buy Christmas pressies and Cal wants a pizza. No suprises coming my way but a decent book, some music and a couple of DVDs. Still that'll be nice.

    Windy Miller

    Start the day at Consignit in the ever lovely Macclesfield. Looking at an FoI enquiry management system. Scandinavian style offices in an old mill. Coffee chat, product demo and honesty (wasn't expecting that). Head back to Liverpool and visit Joan Traynor to retrieve some of our kit. In reception I bump into Marje Morrison. Shoot the breeze, share some goss, I have more than she has, but hey! I'm an information professional. Nice to see her. Ring Jim about this morning from a car park in Kirkby. Good chat. Then it's off to pick up Cal who is due at the Dentists. Fancy dress day at the school so I'm picking up a Thunderbird. Then we need to race cross city to meet Monst who has ominously been shopping. Still feeling shite about life. Know I need to buy presents for the folks and Jacob and Katja but really don't feel up for it. Mainly because much as it suprises people if I buy a present I tend to to like to think about the individual. Right now I don't fancy that.

    Wednesday, December 15, 2004

    It's not cricket I tell you....

    Begin GL6 conference blog. Apologies to any speakers, the notes are mine and I only offer Gerbner's Model of Communication in my defence! While I'm on the communication debate, ECB hang your head in shame, sell out to Murdoch is a disgrace. Thank non-existent deities TMS is safe.

    Cataclysmic Reflection on the Schizophrenic Greyness of Scholarly Educational and Cultural Communication - James G. Neal

    Why the title:

  • Grey - a retrievable state, a notion of middling informal material
  • Reflection - a reflective mirro of library perspectives
  • Schizophrenic - key issues misspercieved as physical/virtual, ownership/access, generalist/specialised
  • Works - equally embraced. Luxembourg definition is fine still but is it too big, where is the legitimacy.
  • Cataclysmic - the whle field lives on dialectic. Grey is increasingly bubbling to the surface and becoming a legitimate field with blurred boundaries between it and white literature. Trends:
  • E-materials defy geography and change the nature of peer review. They are graphic, interactive offer democracy of authorship and invite democratic review. Not a repeat of the analogue experience. Hypertext shifts meaning. Information is defined by the relationship to other literature. Things are dynamic and fluid.
  • Self service ATM culture increases, convenience is the key to the end user experience. True added value is offeed by accessibility, availability enhanced by true searchability. Users can explore a whole collection and make use of materials flatlined from other disciplines and in multi-formats including multimedia. Indicates that information is freeing itself from media, the media is no londer the message it is the delivery system. Gives user spatial not discipline awareness and offers great opportunities for information synthesis.
  • Archiving, large issues around digital archiving and coping with hybrid services. Long term availability needs to be enshrined in digital products.
  • Digital libraries/portals/institutional repostories the key navigational point and will blur edges fo grey/white dichotomy. They need to identify their potential users, how they use them, where they're from, why they use them and when they use them (market, market, market!). Allows for disaggregation beyond institutional boundaries. Need to be creative, JUST DO IT!
  • Scholarly communication - area of much debate, costs are the key, market is globalized and proliferation is the order of the day, no control over what is produced, need to question where the quality comes from. Peer review in crisis Where does it go in the corporate economy which distorts the communication in a dysfunctional market that thrives on a Darwinian Capitalistic approach. This is opposed by the socialist and anarchic nature of grey literature - pre-print etc. In between run open access initiatives. Open access is still confused, costs still not clear. Halfway house offers some sort of information Utopia. In all of this the intellectual property is the key thing. Who controls it, how is it distributed? Technology is focussed on digital rights and consortia purchase further distorts the market dividing the world into the information rich and the information poor.
  • Peer review - linked to motivation to publish, communication/kudos are key not financial reward. Increasingly review is diversified with open peer review offering 360 degree scrutiny. Industrial review relates to company needs and bottom line. Technology allows new review processes. Conclusion:
  • Trompe l'oeil libraries - use new media to wrap material up in traditional trappings for user ccomforts. This is not a bad thing to do reflects the reality of user desire. Just need to be smarter about doing it.
  • Quality = content and functionality
  • Value = quality and traffic
  • Information professional - resource for corporate policy and advocate for information using community.

  • Er...It ain't Tuesday or Thursday but It Don't Feel Like Wednesday

    Ring home am. Tearful mother, not good. Speak to Adam here and let him know why I'm likely to be a miserable bastard for a while. Agree a trip to Didcot is in order. Can't tell Monst though and not happy about all this stupid cloak and dagger stuff. Not happy with the situation in any shape or form. Day odd anyway because I overslept and didn't get in until gone half seven. Always throws me. Blog the stuff I furled yesterday. People at work keep me amused and it's a day of sorting guidance notes for FoI. Scan Tracy's scans which is a bit of a highlight. Good things.

    Tuesday, December 14, 2004

    Caroline no need to spell it backwards, thats eniloraC

    Pissed off I'm still working on the news. It's easier than thinking. Things burble away in my head when I stop. Ian be warned you've seen the result of me in a miserable mood. Dust off that guitar....

    If you believe in nothing, it believes in you

    Hide in the familiarity and jangly sound of Robyn Hitchcock. Wry amusement factor is high and so is the frankly bizarre level but I love it for it. Right now it's what I need, something to take me away from the place I'm sat right now. Feel shite. Suspect tomorrow I'll feel shite. Suspect the day after I'll feel shite too. Apologies to anyone around me right now because I can't be sure I ain't gonna be snappy, grumpy and sweary. If it gets too much just tell me to shut up, pour more coffee down my throat and get over it all. Fuck it, what a fucking drama queen.

    Family Fun

    Mention to Monst the fact my folks are due up at the weekend. She refuses to let Cal see them. I wind up ringing the folks and I'm in full Mr. Angry Mode. On reflection unhelpful but I'm deeply upset about this. Beck hasn't been in touch and she's now created a situation where Cal can't see his Grandparents effectively meaning I can't see my folks because I have no child care - deep joy. They blame Monst, I blame Beck and the whole thing is a fucking mess that is both stupid and irritating. At the moment I cling to work, it's about the only fucking sanity I've got. That and beer of course and then in quantities that are small just so I remind myself how much I enjoy a drink and no more. Only got a bottle of Bah Humbug in tonight which is as well I could sink more than a few the way I feel. Instead take it out on the blog. My folks of course are upset. They see it all as one sided. They don't want to upset Beck, they blame themselves. They blame Monst for the current situation and they have a point, she's turned into her Dad, stubborn and not thinking about Cal. They think this is all about any dosh they could leave us. It's fuck all to do with that. My sister could have shown simple common courtesy and called me and chatted through her concerns. Did she do that? No, instead she stamps her foot and I reap the consequences. Great. I pick up the pieces. Feel I should drop everything and get to Didcot but I have commitments here can't do it right now. It's all Fubar.

    Map of Medicine - Librarian Roles - Laura Tucker

    Knowledge support tool. Integrates with decision support but not there yet. Working with NLH integrates NLH knowledge resources with patient record. Will be able to search NLH from pathway. Will also integrate patient information. Supports referral and people working out of comfort zone. Solves the too much information problem. Allows local input to support local practice through patien centric pathways. Standardises local practice. Localisable? Local health community can be variable at local health community level. Want primary and secondary care. No tertiary pathways yet. Could be a prob in some Chesh and mersey health communities may have prob. Rerepresents information in accessible format. Can be used by anybody. Primary care use it in preparation not live. Freaky stuff to be added. Clinicians locally can adapt. Hypertext links. Referral letters can shown on map. Capacity for choose and book to interact. Role in teaching the map. CSC not contracted. Will not be deployed by NLH. Not paying licence. Will make resource available. Relies on LSP to purchase. XML and Snomed content. Timescales unknown.

    Career Development - Chartership Propaganda

    Look for the transferrable skills. Ye olde chartership thing. Aaargh! Tips on organising records. Database or diary. For CPD events. Methods listed. Comments etc. Vibe. Mentor useful. Mailing lists. Handy. Nice chat but could live without it.

    Museums Libraries and Archives North West - John Finch

    Strategic organisation for MLA get core funding from DCMS. Live in Warrington. Key drivers: communities, education learning and skills, knowledge economy. 9 prog areas and aim to inspire learning for all. Key gov driver, toolkit to measure learning. Work on: archives task force, renaissance in the regions, framework for the future (public library orientated). Key activities: Advocacy to funders, stakeholders Research and data collection Engage broader cultural sector Collaborate with regional partners Influence national debate and policy Develop the workforce Also support peoples network, time to read, designation (award for museums and extend to libs and archives), INSPIRE access to learning for adults, increase access, learner focus 'Addlib' brand, widening participation. Evidence of further learning. Advocacy key, conduit to gov, link to national stakeholders and regional stakeholders. Proactive key reg networks NWDA, Learning and skills council, tourism boards. Performance measurement: what is gathered and why? Developing toolkit. Researching users. Develop workforce, dev key links, map skill needs, leadership training. www.mlanorthwest.com

    Monday, December 13, 2004

    Rog Daltry is Getting Old

    OK news continues to plague me. Nearly to date and now wish to scream. Sally called in still suffering (quick mutter to Thoth in his physician role, Ibis not Baboon if you please). David began today, don't think I paid enough attention to him. Must try harder. Thing is I had stuff I needed to do. Jim calls, we chat, hadn't realised his Dad had died. Mutter condolences don't think he realises I really mean it. Shit time for a geezer I like.

    Quick post anyway to at least have something to show for the day.

    Sunday, December 12, 2004

    Sunday Slug-A-Bed

    Up late, unusually I was the last person in the house up. More unusually I awake to a breakfast prepared by Monst. Freaky but very pleasant. Then it's off to get the photies developed in the case of the gubbins from New York last week or printed in the case of the digital stuff from yesterday. Boots of Speke. I take a good book only to find the digi prints printed in double quick time. Repair to Starbucks and find no joy with the other processing. So run away and hide for another 20 minutes. Worthwhile because I get a partial refund. Then round to Asda to get cat food for poor Katie who's nearly eaten her last batch and to begin the Chrimbo drink shop. Come away with Port, Bacardi and a bottle of Sherry (reminds me of Joe Willy the maternal grandfather who fed us the stuff regularly before meals for years - so a bit of a poignant drink round Christmas). Then Tesco's to pick up a bottle of Mount Gay. Job done return home to begin blog posts of photos and listen to the match while cooking dinner.

    Ice Slide Part II

    Ice Slide Part II
    Now this slide was fast and long. Cal and I played on it for a good while. Monst bollocked us for not getting back to the bus quick enough as a result. Mind you we were still early. Posted by Hello

    Ice Slide Part I

    Ice Slide Part I
    The Polar Bear hid an ice slide. Very popular with the younger member of the family and the family's biggest kid! Although there was a bigger slide we enjoyed more! Posted by Hello

    Maze

    Maze?
    Monst heads down a corridoor. The Ice Palace was a maze. Quite fun though! Posted by Hello

    Where's my glass

    Another Lump of Ice
    More ice sculpture. A bit big to fit in a glass. Behind the hangings, bedrooms furnished with a mattress and pillow. Luxury not compulsory then! Posted by Hello

    Sculptures on the Bar

    Ice Sculture I
    The bar and its scupltures. There were beds in the ice palace but it was not suprisingly freezing. Can't see many people wanting to stop in it. An experience if not a pleasure though. Posted by Hello

    Ice Bar

    Ice Bar
    The Ice Bar. Oddly enough there weren't many takers for the seating. Look at the plus side, need ice in your drink, just hack away at the table. Mind you might be a bit chilly on yer bum. Posted by Hello

    Sure Ain't Rudolf!

    Rudolf it is not
    Reindeer in the Ice Palace.  Posted by Hello

    Where'd the Fox Get?

    Glacier Mint Anyone?
    Sponored by Fox's Glacier Mints. The mint advertised confusingly by a Polar Bear? Can you still buy 'em? Posted by Hello

    Husky/Wolf You Choose


    Couldn't decide if this was a wolf or a husky, either way was most impressive. Especially if like me you fail to have the ability to raise even a half decent snowman, not that I raise indecent snowmen, if I tried that sort of thing the relevant bits'd just fall off. Posted by Hello

    Don't Tell Him, It Ain't Going Nowhere!

    Snow Sleigh
    Cal drives the snow sculpture sleigh. Snow sculpture impressed me mightily. So lots of photies! Posted by Hello

    Balls, Snowballs to Be Precise

    Balls, Snowballs
    Cal loved the snow and spend much time covering me with the stuff. He's got a mean arm on im when equipped with a snowball. Monst naturally sided with Cal. My revenge, a pic of her bum! Posted by Hello

    There Ain't No Sanity Clause

    Ho, Ho, Ho, No Wonder Santa is Happy
    Cal and Santa chat. OK I don't believe in the Santa geezer but Cal has yet to ask me if he's real. The blokey was a bit of a star. Very pleasant and chld friendly. Note the psuedo-elf on the phone. Very high tech thses days the Santa-ing trade. 'Fraid no pics of reindeer, they don't like flash photography and being the animal fiendly soul I try to be I didn't want to upset them. Plus they have huge antlers and a debatable sense of humour. Posted by Hello

    Shamanic Bits in Lapp, My Understanding Nil

    Shawoman
    Shaman (Shawoman?) at the Lappish ceremony. Quick daub of chacoal for most people until she got to me. Then a load of burbling, drawing and some bark/seeds shoved down my neck. Not certain what it all meant, something to do with me needing more wisdom/fertility/being ill were top guesses. Hut as we entered resounded to boom of drum played with a ham bone as a stick. For me one of the more interesting bits of yesterday. Not certain about its significance though. Posted by Hello